WELL · 42-015-30795 · DISTRICT 3

Austin College #30

Plugged

Austin County · Raccoon Bend (Gutowsky) field  · Vertical

Austin College #30 (API 42-015-30795) is a plugged well in Austin County, plugged November 6, 2023, last operated by Enhanced Energy Partners Corp.

The RRC has issued 2 drilling permits between 2001 and 2008, permitted to 5,500 ft.

Completion filings report 3 formation tops, including Paine, Gutowsky, Grawunder.

Its 2 leases have reported 487K barrels of oil and 111K mcf of gas since January 1993, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

Enhanced Energy Partners Corp

Tomball, TX · P-5 Y, filed Oct 4, 2025 · 172 permits on file · (281) 744-3936

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnhanced Energy Partners Corp
Production reportsEnhanced Energy Partners Corpthrough Apr 2026
Latest permitEnhanced Energy Partners CorpAug 6, 2008
5,500
total depth, ft
2
permits on file
Aug 6, 2008
last permit issued
Mar 11, 2008
completed
487K
cumulative oil, bbl
111K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 11, 2008
Shut in
—
Plugged
Nov 6, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Austin College O-3-8884Raccoon Bend (Gutowsky)Enhanced Energy Partners Corp6289K20.3KJan 1993 – Jul 2026
Austin College O-3-24068Raccoon Bend (Cockfield 4000)Enhanced Energy Partners Corp1198K90.4KSep 2001 – Aug 2008

Oil, barrels lease total

Last 12 months 9,622 · prior 12 8,208(+17%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Feb 1993 → Apr 1999
  2. 2Future Petroleum CorporationMay 1999 → Jul 1999
  3. 3Bargo Energy CompanyAug 1999 → May 2001
  4. 4Mission Resources CorporationJun 2001 → Nov 2003
  5. 5T-N-T Engineering, Inc.Dec 2003 → Sep 2007
  6. 6Enhanced Energy Partners CorpOct 2007 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
666991-99RecompletionEnhanced Energy Partners CorpJul 17, 2008Aug 6, 2008Feb 6, 20084,105
512326-99DrillMission Resources CorporationAug 7, 2001Aug 7, 2001Aug 21, 20015,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-8884————
—— O-3-24068————

Formation tops

As filed on W-2/G-1. Subsea from 141 ft elevation.Download CSV →

FormationMD ftSubsea
Paine2,700-2,559
Gutowsky3,125-2,984
Grawunder3,400-3,259

Perforations

Perforated and open-hole intervals.

FromToType
3,3053,310Perforated
3,3163,319Perforated
4,1104,118Perforated
4,1284,140Perforated
4,1704,174Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62585612.25336 S
5.55,4007.875380 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 8, 2008Aug 7, 2008Yes
00Aug 18, 2008Oct 6, 2003—
00Oct 21, 2003Oct 6, 2003—
00Jun 2, 2003May 5, 2003—
00Jan 29, 2002Nov 29, 2001—
00Nov 5, 2001Sep 21, 2001Yes
00Oct 30, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.