WELL · 42-015-30809 · DISTRICT 3
Diemer Mrs. Alberta #20
Austin County · Raccoon Bend (Cockfield 4000) field · Vertical
Diemer Mrs. Alberta #20 (API 42-015-30809) is a plugged well in Austin County, plugged October 10, 2014, last operated by Enhanced Energy Partners Corp.
The RRC has issued one drilling permit, issued October 22, 2001, permitted to 5,000 ft.
It was permitted by Mission Resources Corporation and has since transferred to Enhanced Energy Partners Corp on the wellbore schedule.
Completion filings report 2 formation tops, including Gutowsky A, Grawunder.
Operator of record
Permitted by Mission Resources Corporation; the EWA schedule now lists a different operator.
Tomball, TX · P-5 Y, filed Oct 4, 2025 · 172 permits on file · (281) 744-3936
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enhanced Energy Partners Corp |
| Production reports | Mission Resources Corporationthrough Sep 2002 |
| Latest permit | Mission Resources CorporationOct 22, 2001 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 1
- permits on file
- Oct 22, 2001
- last permit issued
- Nov 11, 2001
- completed
- 0
- cumulative oil, bbl
- 87.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2001 THROUGH Oct 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 11, 2001
- Shut in
- —
- Plugged
- Oct 10, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Diemer, Mrs. Alberta G-3-187109 | Raccoon Bend (Cockfield 4000) | Enhanced Energy Partners Corp | 1 | 0 | 87.3K | Nov 2001 – Oct 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mission Resources CorporationDec 2001 → Sep 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 514670-99 | Drill | Mission Resources Corporation | Oct 22, 2001 | Oct 22, 2001 | Oct 25, 2001 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-187109 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 127 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gutowsky A | 3,171 | -3,044 |
| Grawunder | 3,502 | -3,375 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,950 | 3,962 | Perforated |
| 4,070 | 4,082 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 856 | 12.25 | 350 S |
| 5.5 | 4,500 | 7.875 | 457 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 30, 2002 | Apr 11, 2002 | — |
| 00 | Mar 12, 2002 | Jan 22, 2002 | Yes |
| 00 | Feb 28, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-015-30809 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-015-30809 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/01530809, documented in the API reference.