WELL · 42-015-30833 · DISTRICT 3

Schaer Unit #2

Y

Austin County · Orange Hill S.(wilcox 11000) field · Producing  · Vertical

Schaer Unit #2 (API 42-015-30833) is a well in Austin County operated by Etoco L.P., completed August 2, 2003 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 22, 2003, permitted to 12,000 ft.

It was permitted by Etoco Incorporated and has since transferred to Etoco L.P. on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Etoco L.P.

Permitted by Etoco Incorporated; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Feb 4, 2026 · 48 permits on file · (713) 805-3001

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEtoco L.P.
Production reportsEtoco, L.P.through Apr 2026
Latest permitEtoco IncorporatedMay 22, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
May 22, 2003
last permit issued
Aug 2, 2003
completed
0
cumulative oil, bbl
1.84M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 2, 2003
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schaer Unit G-3-196881Orange Hill, S.(wilcox 11000)Etoco, L.P.101.84MAug 2003 – Jul 2026

Gas, mcf lease total

Last 12 months 30,837 · prior 12 32,883(-6%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Etoco IncorporatedAug 2003 → May 2005
  2. 2Etoco, L.P.Jun 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
532221-99DrillEtoco IncorporatedMay 22, 2003May 22, 2003May 31, 200312,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-196881————

Perforations

Perforated and open-hole intervals.

FromToType
10,99211,332Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,82112.251,148 S
5.511,8008.752,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 20, 2003Sep 19, 2003Yes
00Oct 3, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/01530833, documented in the API reference.