WELL · 42-021-31371 · DISTRICT 1
Gabriel #9
Bastrop County · Ross Lee (Austin Chalk) field · Vertical
Gabriel #9 (API 42-021-31371) is a plugged well in Bastrop County, plugged November 12, 2020, last operated by United Operating LLC.
The RRC has issued one drilling permit (amended once), issued September 27, 1990, permitted to 3,500 ft.
It was permitted by Shale Operating CO. and has since transferred to United Operating LLC on the wellbore schedule.
Completion filings report one formation top, including Dale Lime.
Its lease has reported 16.7K barrels of oil and 89 mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Shale Operating Co.; the EWA schedule now lists a different operator.
Austin, TX · P-5 Y, filed May 29, 2025 · 5 permits on file · (512) 203-5377
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | United Operating LLC |
| Production reports | United Operating, LLCthrough Oct 2014 |
| Latest permit | Shale Operating Co.Sep 27, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 2
- permits on file
- Sep 27, 1990
- last permit issued
- —
- completed
- 16.7K
- cumulative oil, bbl
- 89
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 12, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gabriel O-1-13370 | Ross Lee (Austin Chalk) | United Operating, LLC | 6 | 16.7K | 89 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shale Operating Co.Mar 1993 → Mar 1995
- 2Thomas Oil & Gas CompanyJun 1996 → Aug 1997
- 3Axis Energy CorporationSep 1997 → Apr 2001
- 4Rayalto Oil & Gas, Inc.Jun 2001 → Feb 2004
- 5R & S Energy CompanyMar 2004 → Feb 2006
- 6Orbis Operating, LLCMar 2006 → Jun 2006
- 7United Operating, LLCSep 2014 → Oct 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 378509-98 | Drill | Shale Operating Co. | Sep 17, 1992 | Sep 27, 1990 | Nov 11, 1990 | 3,185 |
| 378509-99 | Drill | Shale Operating Co. | Sep 25, 1990 | Sep 27, 1990 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-13370 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,960 | 3,170 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 420 | 12.25 | 194 S |
| 5.5 | 3,185 | 7.875 | 430 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 2, 1993 | Jun 16, 1993 | Yes |
| 00 | Jun 22, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-021-31371 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-021-31371 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02131371, documented in the API reference.