WELL · 42-023-30508 · DISTRICT 9

Psencik R. #2

Plugged

Baylor County · Baylor County Regular field  · Vertical

Psencik R. #2 (API 42-023-30508) is a plugged well in Baylor County, plugged November 17, 2022, last operated by Royal Petroleum CO..

The RRC has issued one drilling permit, issued March 10, 1978, permitted to 1,600 ft.

It was permitted by Rainwater, C. F. and has since transferred to Royal Petroleum CO. on the wellbore schedule.

Completion filings report 2 formation tops, including Coleman Junction, Dothan.

Its lease has reported 10K barrels of oil and 72 mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Royal Petroleum Co.

Permitted by Rainwater, C. F.; the EWA schedule now lists a different operator.

Iowa Park, TX · P-5 Y, filed Sep 4, 2025 · 18 permits on file · (940) 631-4347

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRoyal Petroleum Co.
Production reportsRoyal Petroleum Co.through Feb 2017
Latest permitRainwater, C. F.Mar 10, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,600
total depth, ft
1
permits on file
Mar 10, 1978
last permit issued
Sep 14, 1978
completed
10K
cumulative oil, bbl
72
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 14, 1978
Shut in
—
Plugged
Nov 17, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Psencik, R. O-13-18781Baylor County RegularRoyal Petroleum Co.810K72Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Reynolds, RichardJan 1993 → Feb 1996
  2. 2T.L.C. Oil Co.Mar 1996 → Jan 1999
  3. 3Talon Production, Inc.Feb 1999 → Jul 2000
  4. 4Terry's Roustabout Service, Inc.Dec 2000 → Aug 2001
  5. 5Midwestern EnergyNov 2002 → Feb 2011
  6. 6Royal Petroleum Co.Apr 2012 → Feb 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
19795-99DrillRainwater, C. F.Mar 10, 1978Mar 10, 1978Sep 11, 19781,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-18781————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Coleman Junction1,084
Dothan1,326

Perforations

Perforated and open-hole intervals.

FromToType
1,5061,512Perforated
—1,610Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251049.7575 S
4.51,6107.75150 S
4.51,6107.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 21, 2012Oct 25, 2012—
00May 26, 2004Feb 21, 2001—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
451K
bbl, all reported
Feb 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000031028W-14 DisposalPlugged Dec 5, 20223006001,506–1,512

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02330508, documented in the API reference.