WELL · 42-023-30877 · DISTRICT 13

Hargrave-Portwood "B" #1

N

Baylor County  · Vertical

Hargrave-Portwood "B" #1 (API 42-023-30877) is a former disposal or injection well in Baylor County, last operated by Chital Petroleum Corp.; its UIC permit is no longer active.

The RRC has issued 3 drilling permits between 1982 and 1988, permitted to 5,062 ft.

Operator of record

Chital Petroleum Corp.

Wichita Falls, TX · P-5 Y, filed Sep 6, 2002 · 170 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitChital Petroleum Corp.May 17, 1988
5,062
total depth, ft
3
permits on file
May 17, 1988
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
346554-99ReenterChital Petroleum Corp.May 16, 1988May 17, 1988—2,800
249474-99OtherChital Petroleum Corp.Aug 16, 1984Aug 23, 1984—2,800
177474-99DrillChital Petroleum Corp.Nov 17, 1982Nov 17, 1982—5,062

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Feb 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082636W-14 DisposalCanceled Nov 6, 19962,0001,2002,522–2,600

MONTHLY INJECTED, BBL · H-10 · LAST 16 REPORTED MONTHS

Last 12 months 0

0119951996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02330877, documented in the API reference.