WELL · 42-023-30880 · DISTRICT 9

Criswell #6I

Plugged

Baylor County · Baylor County Regular field  · Vertical

Criswell #6I (API 42-023-30880) is a plugged well in Baylor County, plugged July 29, 1986, last operated by Texil Resources Inc..

The RRC has issued one drilling permit, issued November 15, 1982, permitted to 1,500 ft.

Operator of record

Texil Resources Inc.

Dallas, TX · P-5 Y, filed Feb 15, 1985 · 41 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexil Resources Inc.
Production reportsnone
Latest permitTexil Resources, Inc.Nov 15, 1982
1,500
total depth, ft
1
permits on file
Nov 15, 1982
last permit issued
Mar 30, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 30, 1983
Shut in
—
Plugged
Jul 29, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
177517-99DrillTexil Resources, Inc.Nov 15, 1982Nov 15, 1982—1,500

Perforations

Perforated and open-hole intervals.

FromToType
1,2881,291Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,320——
4.51,3397.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Apr 8, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
11.8K
bbl, all reported
Oct 1986
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000048660H-1 InjectionPlugged Aug 26, 1986000–0

MONTHLY INJECTED, BBL · H-10 · LAST 4 REPORTED MONTHS

Last 12 months 0

01

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02330880, documented in the API reference.