WELL · 42-023-31044 · DISTRICT 7
Hargrave-Portwood C-D #2
Baylor County · Honey Bee (Mississippian) field · Vertical
Hargrave-Portwood C-D #2 (API 42-023-31044) is a plugged well in Baylor County, plugged December 30, 1993, last operated by Chital Petroleum Corp..
The RRC has issued one drilling permit, issued December 14, 1983, permitted to 5,100 ft.
Its lease has reported 181 barrels of oil and 1 mcf of gas since January 1993, last reporting in January 1994. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Sep 6, 2002 · 170 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chital Petroleum Corp. |
| Production reports | Chital Petroleum Corp.through Jan 1993 |
| Latest permit | Chital Petroleum Corp.Dec 14, 1983 |
- 5,100
- total depth, ft
- 1
- permits on file
- Dec 14, 1983
- last permit issued
- Jan 12, 1984
- completed
- 181
- cumulative oil, bbl
- 1
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 12, 1984
- Shut in
- —
- Plugged
- Dec 30, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hargrave-Portwood "C-D" O-8-17369 | Honey Bee (Mississippian) | Chital Petroleum Corp. | 3 | 181 | 1 | Jan 1993 – Jan 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chital Petroleum Corp.Jan 1993 → Jan 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 223718-99 | Drill | Chital Petroleum Corp. | Dec 14, 1983 | Dec 14, 1983 | — | 5,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-17369 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,567 | 2,584 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 171 | 12.25 | 125 sx |
| 4.5 | 2,823 | 7.875 | 225 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 11, 1988 | Apr 11, 1984 | — |
| 00 | Jul 20, 1984 | Apr 11, 1984 | — |
| 00 | Jul 18, 1984 | Apr 11, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-023-31044 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-023-31044 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.17K
- bbl, all reported
- Apr 1993
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000052096 | W-14 Disposal | Plugged Jan 13, 1994 | 2,200 | 1,200 | 2,567–2,584 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02331044, documented in the API reference.