WELL · 42-023-31095 · DISTRICT 9

Teague Vern C #1

Plugged

Baylor County · Baylor County Regular field  · Vertical

Teague Vern C #1 (API 42-023-31095) is a plugged well in Baylor County, plugged June 3, 1985, last operated by Willis Darwin.

The RRC has issued one drilling permit, issued June 21, 1984, permitted to 1,400 ft.

It was permitted by Roden, O. C. and has since transferred to Willis Darwin on the wellbore schedule.

Completion filings report one formation top, including Tannehill.

Operator of record

Willis Darwin

Permitted by Roden, O. C.; the EWA schedule now lists a different operator.

Graham, TX · P-5 Y, filed Oct 15, 1986 · 5 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWillis Darwin
Production reportsnone
Latest permitRoden, O. C.Jun 21, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,400
total depth, ft
1
permits on file
Jun 21, 1984
last permit issued
Nov 15, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 15, 1984
Shut in
—
Plugged
Jun 3, 1985

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
242719-99DrillRoden, O. C.May 9, 1984Jun 21, 1984Sep 13, 19841,400

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Tannehill1,160

Perforations

Perforated and open-hole intervals.

FromToType
1,1521,164Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512012.2590 S
4.51,1916.25110 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 25, 1985Jan 3, 1985—
00Jan 18, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02331095, documented in the API reference.