WELL · 42-023-31470 · DISTRICT 9
Livingston F. L. B #2
Baylor County · Chardonnay (Caddo) field · Vertical
Livingston F. L. B #2 (API 42-023-31470) is a plugged well in Baylor County, plugged March 1, 1999, last operated by Sunday Corporation.
The RRC has issued one drilling permit, issued April 19, 1993, permitted to 5,900 ft.
It was permitted by Chardonnay Operating, Inc. and has since transferred to Sunday Corporation on the wellbore schedule.
Completion filings report 3 formation tops, including Palo Pinto, Caddo, Mississippian.
Its lease has reported 4.28K barrels of oil and 24 mcf of gas since July 1993, last reporting in November 1999.
Operator of record
Permitted by Chardonnay Operating, Inc.; the EWA schedule now lists a different operator.
Olney, TX · P-5 Y, filed Apr 6, 2018 · 96 permits on file · (940) 564-0339
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sunday Corporation |
| Production reports | Sunday Corporationthrough Jul 1997 |
| Latest permit | Chardonnay Operating, Inc.Apr 19, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,900
- total depth, ft
- 1
- permits on file
- Apr 19, 1993
- last permit issued
- Jul 21, 1993
- completed
- 4.28K
- cumulative oil, bbl
- 24
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1993 THROUGH Nov 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 21, 1993
- Shut in
- —
- Plugged
- Mar 1, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Livingston, F. L. "B" O-13-28611 | Chardonnay (Caddo) | Sunday Corporation | 1 | 4.28K | 24 | Jul 1993 – Nov 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chardonnay Operating, Inc.Jul 1993 → Dec 1996
- 2Sunday CorporationJan 1997 → Jul 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 410789-99 | Drill | Chardonnay Operating, Inc. | Apr 16, 1993 | Apr 19, 1993 | Apr 26, 1993 | 5,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-28611 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,177 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 3,058 | -1,881 |
| Caddo | 4,950 | -3,773 |
| MississippianMISSISSIPPI | 5,254 | -4,077 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,962 | — | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 133 | 12.5 | 100 S |
| 4.5 | 5,326 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 7, 1993 | Aug 3, 1993 | Yes |
| 00 | Aug 11, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-023-31470 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-023-31470 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02331470, documented in the API reference.