WELL · 42-023-31517 · DISTRICT 9
Green #4K
Baylor County · Vertical
Green #4K (API 42-023-31517) is a plugged well in Baylor County, plugged November 6, 1995, last operated by Sunday Corporation.
The RRC has issued 2 drilling permits between 1995 and 1996, permitted to 5,500 ft.
Completion filings report 3 formation tops, including Strawn, Caddo, Mississippian.
Its lease has reported 18.4K barrels of oil and 2 mcf of gas since October 1995, last reporting in December 1998. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Olney, TX · P-5 Y, filed Apr 6, 2018 · 96 permits on file · (940) 564-0339
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Sunday Corporationthrough Sep 1998 |
| Latest permit | Sunday CorporationJan 17, 1996 |
- 5,500
- total depth, ft
- 2
- permits on file
- Jan 17, 1996
- last permit issued
- —
- completed
- 18.4K
- cumulative oil, bbl
- 2
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Dec 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 6, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Green O-13-29033 | Rendham (Mississippi) | Sunday Corporation | 2 | 18.4K | 2 | Oct 1995 – Dec 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sunday CorporationOct 1995 → Sep 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 443615-99 | Reenter | Sunday Corporation | Jan 11, 1996 | Jan 17, 1996 | Jan 17, 1996 | 5,500 |
| 441036-99 | Drill | Sunday Corporation | Oct 19, 1995 | Oct 23, 1995 | Oct 24, 1995 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-29033 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Strawn | 4,900 |
| Caddo | 5,080 |
| MississippianMISSISSIPPI | 5,390 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,394 | 5,402 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 127 | 12.25 | 110 S |
| 4.5 | 5,449 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 8, 1997 | Sep 6, 1996 | — |
| 00 | Dec 31, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-023-31517 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-023-31517 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 65.6K
- bbl, last 12 reported months
- 296K
- bbl, all reported
- Feb 1999
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000085587 | H-1 Injection | Plugged Dec 8, 1998 | 800 | 1,000 | 5,394–5,402 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 65,600 · prior 12 157,675(-58%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02331517, documented in the API reference.