WELL · 42-023-31668 · DISTRICT 9
Helen Lee Portwood 152 #2
Baylor County · Wildcat field · Shut IN · Vertical
Helen Lee Portwood 152 #2 (API 42-023-31668) is a well in Baylor County operated by Just Oil & Gas Inc., completed April 23, 2014 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued March 6, 2014, permitted to 6,000 ft.
It was permitted by Newpek, LLC and has since transferred to Just Oil & Gas Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Barnett, Caddo, Capps Lime, Gunsight.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Newpek, LLC; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Mar 4, 2026 · 1 permits on file · (940) 550-4325
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Just Oil & Gas Inc. |
| Production reports | none |
| Latest permit | Newpek, LLCMar 6, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Mar 6, 2014
- last permit issued
- Apr 23, 2014
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 23, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Helen Lee Portwood 152 O-13-32900 | Wildcat | Just Oil & Gas, Inc. | 1 | 0 | 0 | Apr 2014 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 780031-99 | Drill | Newpek, LLC | Feb 18, 2014 | Mar 6, 2014 | Apr 12, 2014 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-32900 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,256 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Barnett | — | — |
| Caddo | — | — |
| Capps Lime | — | — |
| Gunsight | — | — |
| Marble Falls | — | — |
| MississippianMISSISSIPPI | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,198 | 5,211 | Perforated |
| 5,217 | 5,228 | Perforated |
| 5,245 | 5,266 | Perforated |
| 5,281 | 5,307 | Perforated |
| 5,353 | 5,360 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 295 | 12.25 | 217 S |
| 7 | 5,420 | 8.75 | 556 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 8, 2014 | Jul 31, 2014 | Yes |
| 00 | Jul 11, 2014 | Jun 16, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-023-31668 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-023-31668 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02331668, documented in the API reference.