WELL · 42-025-00742 · DISTRICT 2
Dugat Lena et AL #1A
Bee County · Dirks (Hockley 3300) field · Vertical
Dugat Lena ET AL #1A (API 42-025-00742) is a plugged well in Bee County, plugged November 6, 2018, last operated by Doublechek Operating.
The RRC has issued one drilling permit, issued June 26, 1989, permitted to 3,200 ft.
It was permitted by Chesnutt, W.S. Inc. and has since transferred to Doublechek Operating on the wellbore schedule.
Operator of record
Permitted by Chesnutt, W.S. Inc.; the EWA schedule now lists a different operator.
Waelder, TX · P-5 Y, filed Jun 8, 2018
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Doublechek Operating |
| Production reports | R B Oilthrough May 1994 |
| Latest permit | Chesnutt, W.S. Inc.Jun 26, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 1
- permits on file
- Jun 26, 1989
- last permit issued
- Jun 30, 1989
- completed
- 0
- cumulative oil, bbl
- 1.23K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 30, 1989
- Shut in
- —
- Plugged
- Nov 6, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dugat, Lena et AL G-2-132178 | Dirks (Hockley 3300) | Doublechek Operating | 1 | 0 | 1.23K | Jan 1993 – Nov 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesnutt Oil & Gas, Inc.Feb 1993 → Oct 1993
- 2R B OilFeb 1994 → May 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 360695-99 | Reenter | Chesnutt, W.S. Inc. | Jun 22, 1989 | Jun 26, 1989 | — | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-132178 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,152 | 3,158 | Perforated |
| 3,615 | 3,622 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,100 | 12.25 | 890 S |
| 9.625 | 1,100 | 9 | — |
| 5.5 | 3,701 | 8.75 | 445 S |
| 5.5 | 3,701 | 5 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 13, 1990 | Oct 10, 1989 | — |
| 00 | Dec 6, 1989 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-00742 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-00742 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000107681 | UIC Permit | Plugged Dec 10, 1979 | 250 | 0 | 3,615–3,625 |
| 000107692 | UIC Permit | Canceled Jun 11, 2013 | 250 | 0 | 3,400–3,410 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02500742, documented in the API reference.