WELL · 42-025-01368 · DISTRICT 2

Burke, Alma E. #1

Plugged

Bee County  · Vertical

Burke, Alma E. #1 (API 42-025-01368) is a plugged well in Bee County, plugged December 27, 1984, last operated by Mueller Engineering Corp..

The RRC has issued one drilling permit, issued May 29, 1984, permitted to 3,136 ft.

Operator of record

Mueller Engineering Corp.

Corpus Chrsti, TX · P-5 Y, filed May 11, 2001 · 236 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitMueller Engineering Corp.May 29, 1984
3,136
total depth, ft
1
permits on file
May 29, 1984
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Dec 27, 1984

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
240380-99RecompletionMueller Engineering Corp.May 21, 1984May 29, 1984—3,136

Perforations

Perforated and open-hole intervals.

FromToType
2,7062,710Perforated
3,1243,131Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.75426—1,956 S
5.53,136—1,956 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 5, 1984Jun 14, 1984—
00Jul 3, 1984Jun 14, 1984—
00Jan 12, 1984Feb 26, 1975—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02501368, documented in the API reference.