WELL · 42-025-01538 · DISTRICT 2
Thomson, Laura D. "B" #3
Bee County · Vertical
Thomson, Laura D. "B" #3 (API 42-025-01538) is a permitted well in Bee County filed by Mueller Engineering Corp.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1979 and 1990, permitted to 5,200 ft.
Completion filings report one formation top, including Frio.
Operator of record
Corpus Chrsti, TX · P-5 Y, filed May 11, 2001 · 236 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Marwell Petroleum Ltd Partnrshipthrough May 2013 |
| Latest permit | Mueller Engineering Corp.Aug 29, 1990 |
- 5,200
- total depth, ft
- 3
- permits on file
- Aug 29, 1990
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 501K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thomson, Laura D., -B- O-2-4114 | Heard Ranch (4300) | Marwell Petroleum Ltd Partnrship | 1 | 0 | 0 | Jan 1993 – Feb 2016 |
| Thomson, Laura D. "B" G-2-136457 | Heard Ranch (4400) | Marwell Petroleum Ltd Partnrship | 1 | 0 | 501K | Jan 1993 – Dec 2014 |
| — G-2-40443 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mueller Engineering Corp.Jan 1993 → Feb 2002
- 2Riddle Engineering Corp.Mar 2002 → Jun 2003
- 3Marwell Petroleum, Inc.Jul 2003 → Apr 2006
- 4Marwell Petroleum Ltd PartnrshipMay 2006 → May 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 377135-99 | Recompletion | Mueller Engineering Corp. | Aug 27, 1990 | Aug 29, 1990 | — | 4,500 |
| 254565-99 | Recompletion | Exxon Corp. | Oct 12, 1984 | Oct 12, 1984 | — | 5,200 |
| 52570-99 | Other | Exxon Corp. | Jul 11, 1979 | Jul 11, 1979 | — | 5,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-40443 | — | — | — | — |
| — | — G-2-136457 | — | — | — | — |
| — | — O-2-4114 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 124 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 3,910 | -3,786 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,874 | 3,880 | Perforated |
| 4,270 | 4,280 | Perforated |
| 4,440 | 4,450 | Perforated |
| 4,444 | 4,449 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,342 | — | — |
| 8.625 | 1,354 | 12.25 | 490 S |
| 5.5 | 4,512 | 7.875 | 160 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 21, 1991 | Oct 9, 1990 | Yes |
| 00 | Jan 15, 1991 | — | — |
| 00 | Jan 12, 1984 | Oct 10, 1966 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-01538 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-01538 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02501538, documented in the API reference.