WELL · 42-025-01696 · DISTRICT 2

Adams-Schlotterbeck #2 #2

N

Bee County  · Vertical

Adams-Schlotterbeck #2 #2 (API 42-025-01696) is a former disposal or injection well in Bee County, last operated by C-Tech; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 1987 and 2000, permitted to 4,000 ft.

Operator of record

C-Tech

Dallas, TX · P-5 Y, filed May 7, 2004 · 5 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitC-TechJun 12, 2000
4,000
total depth, ft
2
permits on file
Jun 12, 2000
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
496098-99RecompletionC-TechJun 12, 2000Jun 12, 2000—3,300
330605-99OtherC-Tech EngineeringMay 22, 1987Jun 9, 1987Feb 11, 19914,000

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082109W-14 DisposalPlugged Feb 13, 19915005251,844–1,894

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02501696, documented in the API reference.