WELL · 42-025-30999 · DISTRICT 2
Wtu Robinson #4
Bee County · Tuleta West (8966) field · Vertical
Wtu Robinson #4 (API 42-025-30999) is a plugged well in Bee County, plugged August 30, 2006, last operated by West Tuleta Operating Corp..
The RRC has issued 2 drilling permits (amended once) between 1978 and 2002, permitted to 12,000 ft.
Completion filings report 4 formation tops, including Hockley, Pettus, Yegua, Wilcox.
Operator of record
Tuleta, TX · P-5 Y, filed Jun 7, 2019 · 31 permits on file · (361) 362-2403
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | West Tuleta Operating Corp. |
| Production reports | West Tuleta Operating Corp.through Dec 2005 |
| Latest permit | West Tuleta Operating Corp.Apr 15, 2002 |
- 12,000
- total depth, ft
- 3
- permits on file
- Apr 15, 2002
- last permit issued
- Oct 25, 1978
- completed
- 0
- cumulative oil, bbl
- 508K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 25, 1978
- Shut in
- —
- Plugged
- Aug 30, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wtu-Robinson G-2-190564 | Tuleta, West (Slick-Wilcox 7900) | West Tuleta Operating Corp. | 1 | 0 | 149K | Apr 2002 – Jan 2007 |
| Wtu Robinson G-2-80413 | Tuleta, West (8966) | West Tuleta Operating Corp. | 1 | 0 | 359K | Jan 1993 – Apr 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1West Tuleta Operating Corp.May 1993 → Dec 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 518902-98 | Recompletion | West Tuleta Operating Corp. | Aug 23, 2002 | Apr 15, 2002 | Apr 10, 2002 | 8,620 |
| 518902-99 | Recompletion | West Tuleta Operating Corp. | Apr 8, 2002 | Apr 15, 2002 | — | 8,125 |
| 30373-99 | Drill | Harris, R. C. | Aug 10, 1978 | Aug 10, 1978 | Aug 31, 1978 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-80413 | — | — | — | — |
| — | — G-2-190564 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 307 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,940 | 7,945 | Perforated |
| 8,966 | 9,040 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,150 | 13.75 | 585 S |
| 7.625 | 8,324 | 9.875 | 590 S |
| 9.875 | 8,424 | 9.875 | 590 S |
| 2.375 | 8,932 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 23, 2003 | May 10, 2002 | Yes |
| 00 | Sep 25, 2002 | — | — |
| 00 | Jan 12, 1984 | Dec 12, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-30999 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-30999 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02530999, documented in the API reference.