WELL · 42-025-31950 · DISTRICT 2

Tex-Tom #1-A

Plugged

Bee County · Tynan (3350) field  · Vertical

Tex-Tom #1-A (API 42-025-31950) is a plugged well in Bee County, plugged June 28, 2002, last operated by Rio Bravo Expl. & Prod. CO..

The RRC has issued one drilling permit, issued November 15, 1982, permitted to 4,009 ft.

It was permitted by Gulf Sands Oil CO. and has since transferred to Rio Bravo Expl. & Prod. CO. on the wellbore schedule.

Operator of record

Rio Bravo Expl. & Prod. Co.

Permitted by Gulf Sands Oil Co.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Apr 4, 2026 · 21 permits on file · (713) 316-9840

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRio Bravo Expl. & Prod. Co.
Production reportsA T M Corporationthrough Jun 1997
Latest permitGulf Sands Oil Co.Nov 15, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,009
total depth, ft
1
permits on file
Nov 15, 1982
last permit issued
Dec 6, 1982
completed
0
cumulative oil, bbl
13.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2002

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 6, 1982
Shut in
—
Plugged
Jun 28, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tex-Tom G-2-106098Tynan (3350)Rio Bravo Expl. & Prod. Co.1013.6KJan 1993 – Jun 2002

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gulf Sands Oil Co.Jan 1993 → Oct 1994
  2. 2A T M CorporationJan 1997 → Jun 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
179983-99DrillGulf Sands Oil Co.Nov 15, 1982Nov 15, 1982—4,009

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-106098————

Perforations

Perforated and open-hole intervals.

FromToType
3,3463,350Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515012.25135 S
2.3753,492——
4.54,0097.875750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Feb 28, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02531950, documented in the API reference.