WELL · 42-025-32005 · DISTRICT 2

Dougherty Properties -C- #1

Plugged

Bee County · Dougherty Ranch (10350) field  · Vertical

Dougherty Properties -C- #1 (API 42-025-32005) is a plugged well in Bee County, plugged June 25, 2019, last operated by Hughes Dan A. Company L.P..

The RRC has issued one drilling permit, issued May 20, 1983, permitted to 12,000 ft.

It was permitted by Hughes & Hughes and has since transferred to Hughes Dan A. Company L.P. on the wellbore schedule.

Completion filings report 4 formation tops, including Jackson, Yegua, Reklaw, Wilcox.

Operator of record

Hughes Dan A. Company L.P.

Permitted by Hughes & Hughes; the EWA schedule now lists a different operator.

Beeville, TX · P-5 Y, filed Nov 4, 2025 · 207 permits on file · (361) 358-3752

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHughes Dan A. Company L.P.
Production reportsHughes, Dan A. Company, L.P.through Feb 2019
Latest permitHughes & HughesMay 20, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
May 20, 1983
last permit issued
Nov 25, 1991
completed
0
cumulative oil, bbl
1.78M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 25, 1991
Shut in
—
Plugged
Jun 25, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dougherty Properties -C- G-2-106806Dougherty Ranch (10350)Hughes, Dan A. Company, L.P.101.78MJan 1993 – Jun 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hughes, Dan A. CompanyJan 1993 → Mar 2006
  2. 2Hughes, Dan A. Company, L.P.Apr 2006 → Feb 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
195852-99DrillHughes & HughesMay 20, 1983May 20, 1983Jun 19, 198312,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-106806————

Formation tops

As filed on W-2/G-1. Subsea from 348 ft elevation.Download CSV →

FormationMD ftSubsea
Jackson3,100-2,752
Yegua4,200-3,852
Reklaw7,800-7,452
Wilcox8,000-7,652

Perforations

Perforated and open-hole intervals.

FromToType
10,28810,312Perforated
10,41010,426Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,49114.751,615 S
7.6259,0189.875625 S
2.37510,200——
4.511,5746.75375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 13, 1992Dec 5, 1991—
00Jan 12, 1984Aug 26, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02532005, documented in the API reference.