WELL · 42-025-32005 · DISTRICT 2
Dougherty Properties -C- #1
Bee County · Dougherty Ranch (10350) field · Vertical
Dougherty Properties -C- #1 (API 42-025-32005) is a plugged well in Bee County, plugged June 25, 2019, last operated by Hughes Dan A. Company L.P..
The RRC has issued one drilling permit, issued May 20, 1983, permitted to 12,000 ft.
It was permitted by Hughes & Hughes and has since transferred to Hughes Dan A. Company L.P. on the wellbore schedule.
Completion filings report 4 formation tops, including Jackson, Yegua, Reklaw, Wilcox.
Operator of record
Permitted by Hughes & Hughes; the EWA schedule now lists a different operator.
Beeville, TX · P-5 Y, filed Nov 4, 2025 · 207 permits on file · (361) 358-3752
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hughes Dan A. Company L.P. |
| Production reports | Hughes, Dan A. Company, L.P.through Feb 2019 |
| Latest permit | Hughes & HughesMay 20, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 1
- permits on file
- May 20, 1983
- last permit issued
- Nov 25, 1991
- completed
- 0
- cumulative oil, bbl
- 1.78M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 25, 1991
- Shut in
- —
- Plugged
- Jun 25, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dougherty Properties -C- G-2-106806 | Dougherty Ranch (10350) | Hughes, Dan A. Company, L.P. | 1 | 0 | 1.78M | Jan 1993 – Jun 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hughes, Dan A. CompanyJan 1993 → Mar 2006
- 2Hughes, Dan A. Company, L.P.Apr 2006 → Feb 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 195852-99 | Drill | Hughes & Hughes | May 20, 1983 | May 20, 1983 | Jun 19, 1983 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-106806 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 348 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,288 | 10,312 | Perforated |
| 10,410 | 10,426 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,491 | 14.75 | 1,615 S |
| 7.625 | 9,018 | 9.875 | 625 S |
| 2.375 | 10,200 | — | — |
| 4.5 | 11,574 | 6.75 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 13, 1992 | Dec 5, 1991 | — |
| 00 | Jan 12, 1984 | Aug 26, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-32005 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-32005 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02532005, documented in the API reference.