WELL · 42-025-32143 · DISTRICT 2
Bush, Edith Smith #4
Bee County · Vertical
Bush, Edith Smith #4 (API 42-025-32143) is a permitted well in Bee County filed by Staples, James W. Prod. CO.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1984 and 1986, permitted to 4,200 ft.
Completion filings report 2 formation tops, including Hockley, Hockley (3500).
Its lease has reported 19.8K barrels of oil and 38K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Tuleta, TX · P-5 Active, filed Sep 16, 2025 · 54 permits on file · (361) 362-7423
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Staples, James W. Prod. Co.through Mar 2026 |
| Latest permit | Staples, James W. Prod. Co.Jan 6, 1986 |
- 4,200
- total depth, ft
- 3
- permits on file
- Jan 6, 1986
- last permit issued
- —
- completed
- 19.8K
- cumulative oil, bbl
- 38K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bush, Edith Smith O-2-7059 | San Domingo, S. (3100 Sd.) | Staples, James W. Prod. Co. | 2 | 19.8K | 38K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 457 · prior 12 458(0%)
Gas, mcf lease total
Last 12 months 110 · prior 12 100(+10%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Staples, James W. Prod. Co.Jan 1993 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 294435-99 | Recompletion | Staples, James W. Prod. Co. | Jan 6, 1986 | Jan 6, 1986 | — | 4,200 |
| 247517-99 | Drill | Staples, James W. Prod. Co. | Jul 31, 1984 | Aug 7, 1984 | — | 4,200 |
| 238808-99 | Drill | Staples, James W. Prod. Co. | May 9, 1984 | May 15, 1984 | Jul 12, 1984 | 4,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-7059 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 325 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Hockley | 3,100 | -2,775 |
| Hockley (3500) | 3,490 | -3,165 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,150 | 3,154 | Perforated |
| 3,490 | 3,494 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 209 | 12.25 | 100 sx |
| 4.5 | 3,735 | 6.75 | 425 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 27, 1986 | Feb 10, 1986 | Yes |
| 00 | Feb 25, 1986 | — | — |
| 00 | Sep 25, 1984 | Sep 7, 1984 | — |
| 00 | Sep 15, 1984 | Sep 7, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-32143 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-32143 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02532143, documented in the API reference.