WELL · 42-025-32240 · DISTRICT 2

Barnhart #1

Plugged

Bee County · Blue Moon (Vicksburg) field  · Vertical

Barnhart #1 (API 42-025-32240) is a plugged well in Bee County, plugged January 24, 2000, last operated by Welder-Heyer Energy Inc..

The RRC has issued one drilling permit, issued January 8, 1985, permitted to 9,500 ft.

It was permitted by Conoco Inc. and has since transferred to Welder-Heyer Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Frio, Vicksburg, Yegua.

Its lease has reported 9.57K barrels of oil and 17 mcf of gas since January 1993, last reporting in March 2000.

Operator of record

Welder-Heyer Energy Inc.

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Feb 9, 2001 · 27 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWelder-Heyer Energy Inc.
Production reportsWelder-Heyer Energy, Inc.through Apr 1999
Latest permitConoco Inc.Jan 8, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,500
total depth, ft
1
permits on file
Jan 8, 1985
last permit issued
Oct 7, 1986
completed
9.57K
cumulative oil, bbl
17
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 7, 1986
Shut in
—
Plugged
Jan 24, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barnhart O-2-7188Blue Moon (Vicksburg)Welder-Heyer Energy, Inc.19.57K17Jan 1993 – Mar 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ventura Oil & Gas CompanyJun 1993 → Jan 1999
  2. 2Welder-Heyer Energy, Inc.Feb 1999 → Apr 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
263763-99DrillConoco Inc.Jan 7, 1985Jan 8, 1985Jan 31, 19859,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-2-7188————

Formation tops

As filed on W-2/G-1. Subsea from 175 ft elevation.Download CSV →

FormationMD ftSubsea
Frio3,019-2,844
Vicksburg4,192-4,017
Yegua6,134-5,959

Perforations

Perforated and open-hole intervals.

FromToType
4,1824,187Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,019202,082 S
9.6256,10012.25730 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 21, 1987Oct 27, 1986—
00Dec 30, 1986——
00Aug 8, 1986May 22, 1986—
00Jul 31, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.