WELL · 42-025-32438 · DISTRICT 2

Pouliot Julia M. #1

Plugged

Bee County · Highline (14100) field  · Vertical

Pouliot Julia M. #1 (API 42-025-32438) is a plugged well in Bee County, plugged July 2, 1996, last operated by Rego Development Company Inc..

The RRC has issued 3 drilling permits between 1987 and 1994, permitted to 16,500 ft.

Completion filings report 3 formation tops, including Pettus, Queen City, Wilcox.

Operator of record

Rego Development Company Inc.

Corpus Christ, TX · P-5 Y, filed Feb 1, 2002 · 24 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRego Development Company Inc.
Production reportsRego Development Company, Inc.through Feb 1995
Latest permitRego Development Company, Inc.Jan 10, 1994
16,500
total depth, ft
3
permits on file
Jan 10, 1994
last permit issued
Jun 2, 1988
completed
0
cumulative oil, bbl
155K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 2, 1988
Shut in
—
Plugged
Jul 2, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pouliot, Julia M. G-2-149602Highline (12,800)J & M Well Salvage Company10123KNov 1993 – Jul 1996
Pouliot, Julia M. G-2-147810Highline (13850)Rego Development Company, Inc.100Nov 1993 – Dec 1993
Pouliot, Julia M. G-2-147707Highline (13850)Rego Development Company, Inc.1032.1KApr 1993 – Nov 1993
Pouliot, Julia M. G-2-128540Highline (14100)Rego Development Company, Inc.100Jan 1993 – Apr 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Rego Development Company, Inc.May 1993 → Feb 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
419688-99RecompletionRego Development Company, Inc.Dec 27, 1993Jan 10, 1994—13,188
412711-99RecompletionRego Development Company, Inc.Jun 11, 1993Sep 27, 1993Apr 13, 199314,093
339646-99DrillSanta FE Energy Oper. Part., LPDec 3, 1987Dec 11, 1987—16,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-128540————
—— G-2-147707————
—— G-2-147810————
—— G-2-149602————

Formation tops

As filed on W-2/G-1. Subsea from 339 ft elevation.Download CSV →

FormationMD ftSubsea
Pettus4,053-3,714
Queen City6,409-6,070
Wilcox8,012-7,673

Perforations

Perforated and open-hole intervals.

FromToType
12,02312,067Perforated
12,83312,839Perforated
13,16513,171Perforated
13,59713,620Perforated
14,04014,055Perforated
14,16914,183Perforated
14,20514,225Perforated
14,33114,341Perforated
14,35314,356Perforated
14,36414,372Perforated
14,46014,472Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
163,260203,427 S
11.759,74014.55,644 S
2.87511,814——
5.514,8706.5555 S
5.514,870——
5.5———

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 29, 1996Sep 27, 1995—
00Sep 28, 1994Dec 23, 1993Yes
00Jun 23, 1994——
00Jun 13, 1994Jun 4, 1993Yes
00Jan 31, 1994——
00Jan 27, 1994——
00Oct 20, 1988Jul 25, 1988Yes
00Oct 14, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02532438, documented in the API reference.