WELL · 42-025-32824 · DISTRICT 2
Wtu Hall #5
Bee County · Tuleta West (Wilcox Mid 9100) field · Vertical
Wtu Hall #5 (API 42-025-32824) is a well in Bee County operated by West Tuleta Operating Corp., completed May 28, 1997.
The RRC has issued 2 drilling permits (amended once) between 1997 and 1998, permitted to 9,160 ft.
Completion filings report 6 formation tops, including Vicksburg, Hickley, Hockley, Yegua.
No lease production has been reported under this well’s leases.
Operator of record
Tuleta, TX · P-5 Y, filed Jun 7, 2019 · 31 permits on file · (361) 362-2403
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | West Tuleta Operating Corp. |
| Production reports | Britanco, L.L.C.through Apr 2026 |
| Latest permit | West Tuleta Operating Corp.May 13, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,160
- total depth, ft
- 3
- permits on file
- May 13, 1998
- last permit issued
- May 28, 1997
- completed
- 0
- cumulative oil, bbl
- 2.25M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1997 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 28, 1997
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wtu Hall G-2-169299 | Tuleta, West (Slick-Wilcox 7500) | Britanco, L.L.C. | 1 | 0 | 2.23M | May 1998 – Jul 2026 |
| Wtu Hall G-2-164698 | Tuleta, West (Wilcox Mid 9100) | West Tuleta Operating Corp. | 1 | 0 | 24.9K | May 1997 – Nov 1998 |
Gas, mcf lease total
Last 12 months 16,394 · prior 12 16,805(-2%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1West Tuleta Operating Corp.Aug 1997 → Apr 2019
- 2Britanco, L.L.C.May 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 476170-99 | Recompletion | West Tuleta Operating Corp. | May 11, 1998 | May 13, 1998 | May 16, 1998 | 9,160 |
| 461817-98 | Drill | West Tuleta Operating Corp. | Aug 15, 1997 | Apr 30, 1997 | — | 9,160 |
| 461817-99 | Drill | West Tuleta Operating Corp. | Apr 30, 1997 | Apr 30, 1997 | May 2, 1997 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-164698 | — | — | — | — |
| — | — G-2-169299 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 359 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,524 | 7,530 | Perforated |
| 9,075 | 9,080 | Perforated |
| 9,086 | 9,096 | Perforated |
| 9,086 | 9,196 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,546 | 12.25 | 1,010 S |
| 4.5 | 9,152 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 24, 1998 | Jun 8, 1998 | Yes |
| 00 | Aug 12, 1998 | — | — |
| 00 | Apr 10, 1998 | Nov 17, 1997 | — |
| 00 | Dec 1, 1997 | Oct 2, 1997 | Yes |
| 00 | Oct 9, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-32824 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-32824 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02532824, documented in the API reference.