WELL · 42-025-33259 · DISTRICT 2
Dah Hall #1
Bee County · Tuleta W. (12910) field · Vertical
Dah Hall #1 (API 42-025-33259) is a plugged well in Bee County, plugged July 30, 2009, last operated by West Tuleta Operating Corp..
The RRC has issued 2 drilling permits (amended once) between 2003 and 2004, permitted to 13,000 ft.
Completion filings report 5 formation tops, including Vicksburg, Pettis Sand, Recklaw, Slick Sand.
Operator of record
Tuleta, TX · P-5 Y, filed Jun 7, 2019 · 31 permits on file · (361) 362-2403
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | West Tuleta Operating Corp. |
| Production reports | West Tuleta Operating Corp.through May 2009 |
| Latest permit | West Tuleta Operating Corp.Dec 22, 2004 |
- 13,000
- total depth, ft
- 3
- permits on file
- Dec 22, 2004
- last permit issued
- Jan 15, 2004
- completed
- 0
- cumulative oil, bbl
- 388K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2004 THROUGH Nov 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 15, 2004
- Shut in
- —
- Plugged
- Jul 30, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dah Hall G-2-208185 | Tuleta, West (Wilcox Mid 9100) | West Tuleta Operating Corp. | 1 | 0 | 382K | Dec 2004 – Nov 2009 |
| Dah Hall G-2-204464 | Tuleta, W. (12910) | West Tuleta Operating Corp. | 1 | 0 | 5.79K | Jan 2004 – Dec 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1West Tuleta Operating Corp.May 2004 → May 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 555113-99 | Recompletion | West Tuleta Operating Corp. | Dec 20, 2004 | Dec 22, 2004 | — | 9,630 |
| 539197-98 | Drill | Hughes, Dan A. Company | Jun 8, 2004 | Dec 3, 2003 | — | 13,000 |
| 539197-99 | Drill | Hughes, Dan A. Company | Dec 3, 2003 | Dec 3, 2003 | Dec 8, 2003 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-204464 | — | — | — | — |
| — | — G-2-208185 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 319 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,154 | 9,164 | Perforated |
| 11,120 | 11,156 | Perforated |
| 11,266 | 11,277 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,500 | 17.5 | 1,730 S |
| 9.625 | 8,276 | 12.25 | 365 S |
| 4.5 | 12,000 | 8.5 | 985 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 18, 2005 | Feb 11, 2005 | Yes |
| 00 | May 12, 2005 | — | — |
| 00 | Feb 7, 2005 | Jul 7, 2004 | Yes |
| 00 | Dec 7, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-33259 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-33259 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02533259, documented in the API reference.