WELL · 42-025-33276 · DISTRICT 2
Borroum #2
Bee County · Caesar South (Wilcox 9770) field · Vertical
Borroum #2 (API 42-025-33276) is a well in Bee County operated by Endeavor Natural Gas LP, completed October 20, 2004.
The RRC has issued 2 drilling permits between 2004 and 2010, permitted to 11,000 ft.
Completion filings report one formation top, including Wilcox.
Its 2 leases have reported 42.4K barrels of oil and 246K mcf of gas since October 2004, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Apr 4, 2026 · 203 permits on file · (830) 876-8874
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Endeavor Natural Gas LP |
| Production reports | Sun Exploration, Inc.through Apr 2023 |
| Latest permit | Endeavor Natural Gas, LPJun 29, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,000
- total depth, ft
- 2
- permits on file
- Jun 29, 2010
- last permit issued
- Oct 20, 2004
- completed
- 42.4K
- cumulative oil, bbl
- 246K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 20, 2004
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Borroum O-2-9467 | Caesar, South (Slick) | Sun Exploration, Inc. | 1 | 42.4K | 5.45K | Jun 2010 – Jul 2026 |
| Borroum G-2-207884 | Caesar, South (Wilcox 9770) | Endeavor Natural Gas, LP | 1 | 0 | 240K | Oct 2004 – Jun 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Endeavor Natural Gas, LLCOct 2004 → Jun 2005
- 2Endeavor Natural Gas, LPJul 2005 → Apr 2013
- 3Sun Exploration, Inc.Jul 2013 → Apr 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 698104-99 | Recompletion | Endeavor Natural Gas, LP | Jun 24, 2010 | Jun 29, 2010 | May 20, 2010 | 10,300 |
| 546360-99 | Drill | Tepee Petroleum Co., Inc. | Jun 1, 2004 | Jun 3, 2004 | Aug 20, 2004 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-207884 | — | — | — | — |
| — | — O-2-9467 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 391 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,832 | 6,836 | Perforated |
| 9,470 | 9,495 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,507 | 12.25 | 465 S |
| 7 | 8,761 | 9.875 | 555 S |
| 4.5 | 9,822 | 6.125 | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 7, 2011 | Jul 2, 2010 | Yes |
| 00 | Nov 19, 2010 | — | — |
| 00 | Jul 13, 2005 | Nov 22, 2004 | Yes |
| 00 | May 2, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-33276 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-33276 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.