WELL · 42-025-33384 · DISTRICT 2
Wtu Robinson #6
Bee County · Tuleta West (Wilcox 8750) field · Vertical
Wtu Robinson #6 (API 42-025-33384) is a plugged well in Bee County, plugged October 25, 2010, last operated by West Tuleta Operating Corp..
The RRC has issued 2 drilling permits in 2006, permitted to 9,000 ft.
Completion filings report 3 formation tops, including Pettus, Yegua, Slick.
Operator of record
Tuleta, TX · P-5 Y, filed Jun 7, 2019 · 31 permits on file · (361) 362-2403
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | West Tuleta Operating Corp. |
| Production reports | West Tuleta Operating Corp.through Oct 2010 |
| Latest permit | West Tuleta Operating Corp.May 9, 2006 |
- 9,000
- total depth, ft
- 2
- permits on file
- May 9, 2006
- last permit issued
- Mar 14, 2006
- completed
- 0
- cumulative oil, bbl
- 50.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Mar 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 14, 2006
- Shut in
- —
- Plugged
- Oct 25, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wtu Robinson G-2-220802 | Tuleta, West (Slick-Wilcox 7900) | West Tuleta Operating Corp. | 1 | 0 | 48.2K | Apr 2006 – Mar 2011 |
| Wtu Robinson G-2-220217 | Tuleta, West (Wilcox 8750) | West Tuleta Operating Corp. | 1 | 0 | 2.78K | Mar 2006 – Dec 2006 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1West Tuleta Operating Corp.Mar 2006 → Oct 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 618355-99 | Recompletion | West Tuleta Operating Corp. | Apr 27, 2006 | May 9, 2006 | — | 8,703 |
| 612497-99 | Drill | West Tuleta Operating Corp. | Jan 17, 2006 | Jan 17, 2006 | Feb 3, 2006 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-220217 | — | — | — | — |
| — | — G-2-220802 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 344 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pettus | 3,800 | -3,456 |
| YeguaBASE YEGUA | 4,730 | -4,386 |
| Slick | 7,450 | -7,106 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,212 | 8,216 | Perforated |
| 8,516 | 8,522 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 3,019 | 12.25 | 1,160 S |
| 4.5 | 8,683 | 7.875 | 575 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 7, 2007 | May 26, 2006 | Yes |
| 00 | Feb 22, 2007 | Mar 30, 2006 | Yes |
| 00 | Nov 6, 2006 | — | — |
| 00 | Oct 17, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-33384 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-33384 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02533384, documented in the API reference.