WELL · 42-025-33425 · DISTRICT 2

Heyser Est. #2

Plugged

Bee County · Candace (2070) field  · Vertical

Heyser Est. #2 (API 42-025-33425) is a plugged well in Bee County, plugged June 23, 2021, last operated by Vega Exploration Inc..

The RRC has issued one drilling permit, issued August 25, 2006, permitted to 2,250 ft.

Operator of record

Vega Exploration Inc.

Neenah, WI · P-5 Y, filed Feb 5, 2021 · 3 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVega Exploration Inc.
Production reportsnone
Latest permitVega Exploration, Inc.Aug 25, 2006
2,250
total depth, ft
1
permits on file
Aug 25, 2006
last permit issued
Sep 5, 2006
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2006 THROUGH Jun 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 5, 2006
Shut in
—
Plugged
Jun 23, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Heyser Est. G-2-237014Candace (2070)Vega Exploration, Inc.100Sep 2006 – Jun 2021

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
624931-99DrillVega Exploration, Inc.Aug 24, 2006Aug 25, 2006Aug 29, 20062,250

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-237014————

Perforations

Perforated and open-hole intervals.

FromToType
2,1412,142Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62524012.25126 S
2.8752,2786.75188 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 31, 2008Jun 23, 2008Yes
00Jul 25, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02533425, documented in the API reference.