WELL · 42-025-33868 · DISTRICT 2
Carpenter #1
Bee County · Fred Long (Hockley 3850) field · Shut IN · Vertical
Carpenter #1 (API 42-025-33868) is a well in Bee County operated by Trailblazer Oil & Gas LLC, completed June 6, 2013 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued April 17, 2013, permitted to 6,000 ft.
It was permitted by Enco Exploration Company and has since transferred to Trailblazer Oil & Gas LLC on the wellbore schedule.
Completion filings report 3 formation tops, including 1900 Sand, 2900 Sand, 3400 Sand.
Its lease has reported 9.92K barrels of oil and 2.5K mcf of gas since June 2013, last reporting in July 2026.
Operator of record
Permitted by Enco Exploration Company; the EWA schedule now lists a different operator.
Goliad, TX · P-5 Y, filed Oct 4, 2025 · (361) 271-9897
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trailblazer Oil & Gas LLC |
| Production reports | Enco Exploration Companythrough Dec 2017 |
| Latest permit | Enco Exploration CompanyApr 17, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,000
- total depth, ft
- 1
- permits on file
- Apr 17, 2013
- last permit issued
- Jun 6, 2013
- completed
- 9.92K
- cumulative oil, bbl
- 2.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 6, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Carpenter O-2-10562 | Fred Long (Hockley 3850) | Trailblazer Oil & Gas LLC | 1 | 9.92K | 2.5K | Jun 2013 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enco Exploration CompanyJun 2013 → Dec 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 760542-99 | Drill | Enco Exploration Company | Apr 11, 2013 | Apr 17, 2013 | May 13, 2013 | 6,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-2-10562 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 303 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 1900 Sand | 2,093 | -1,790 |
| 2900 Sand | 3,238 | -2,935 |
| 3400 Sand | 3,826 | -3,523 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,159 | 4,165 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 726 | 12.25 | 255 S |
| 4.5 | 5,061 | 7.875 | 470 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 4, 2013 | Jun 18, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-025-33868 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-025-33868 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02533868, documented in the API reference.