WELL · 42-029-32550 · DISTRICT 1

Constanza Daniel Jr. #1

Plugged

Bexar County · Fairfield field  · Vertical

Constanza Daniel JR. #1 (API 42-029-32550) is a plugged well in Bexar County, plugged April 1, 2003, last operated by Grosso Construction Company Inc.

The RRC has issued one drilling permit, issued October 6, 1982, permitted to 1,350 ft.

It was permitted by Texas Operating & Production CO. and has since transferred to Grosso Construction Company Inc on the wellbore schedule.

Its lease has reported 144 barrels of oil and 112 mcf of gas since January 1993, last reporting in March 2008.

Operator of record

Grosso Construction Company Inc

Permitted by Texas Operating & Production Co.; the EWA schedule now lists a different operator.

Spring Branch, TX · P-5 Y, filed Sep 6, 2002

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrosso Construction Company Inc
Production reportsGrosso Construction Company, Incthrough Aug 2002
Latest permitTexas Operating & Production Co.Oct 6, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,350
total depth, ft
1
permits on file
Oct 6, 1982
last permit issued
Nov 1, 1982
completed
144
cumulative oil, bbl
112
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 1, 1982
Shut in
—
Plugged
Apr 1, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Constanza, Daniel Jr. O-1-11715FairfieldGrosso Construction Company, Inc1144112Jan 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Grosso Construction Company, IncJan 1993 → Sep 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
173890-99DrillTexas Operating & Production Co.Oct 6, 1982Oct 6, 1982—1,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-11715————

Perforations

Perforated and open-hole intervals.

FromToType
1,2361,253Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,2797.875185 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 13, 1987Nov 13, 1986—
00Mar 5, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02932550, documented in the API reference.