WELL · 42-029-36254 · DISTRICT 1

Taylor #3

Plugged

Bexar County · Somerset field  · Vertical

Taylor #3 (API 42-029-36254) is a plugged well in Bexar County, plugged April 29, 1987, last operated by Barnes-Holder Inc..

The RRC has issued one drilling permit, issued January 11, 1985, permitted to 1,800 ft.

Completion filings report one formation top, including Anacacho.

Operator of record

Barnes-Holder Inc.

Austin, TX · P-5 Y, filed May 7, 1999 · 20 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBarnes-Holder Inc.
Production reportsnone
Latest permitBarnes-Holder, Inc.Jan 11, 1985
1,800
total depth, ft
1
permits on file
Jan 11, 1985
last permit issued
Feb 25, 1985
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 25, 1985
Shut in
—
Plugged
Apr 29, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
263980-99DrillBarnes-Holder, Inc.Jan 11, 1985Jan 11, 1985—1,800

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
AnacachoANACACHO LIME1,364

Perforations

Perforated and open-hole intervals.

FromToType
1,3641,469Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,5386.75228 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 12, 1986May 3, 1985—
00Jan 25, 1986——
00May 15, 1985May 3, 1985—
00May 11, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02936254, documented in the API reference.