WELL · 42-029-37578 · DISTRICT 1

Gilbert #24

N

Bexar County · Fairfield field  · Vertical

Gilbert #24 (API 42-029-37578) is a well in Bexar County operated by Red Chalk Resources LLC, completed December 7, 1986.

The RRC has issued 2 drilling permits between 1986 and 2013, permitted to 1,350 ft.

It was permitted by Omni Oil & Gas, Inc. and has since transferred to Red Chalk Resources LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Escandido, Olmos, Anacacho, Anachaco.

Its 2 leases have reported 101K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The leases carry 68 wells, so these are lease totals, not this well alone.

Operator of record

Red Chalk Resources LLC

Permitted by Omni Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Dec 4, 2025 · (281) 389-8242

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRed Chalk Resources LLC
Production reportsRed Chalk Resources LLCthrough Apr 2026
Latest permitOmni Oil & Gas, Inc.Jun 26, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,350
total depth, ft
2
permits on file
Jun 26, 2013
last permit issued
Dec 7, 1986
completed
101K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 7, 1986
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 68 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gilbert O-1-11623FairfieldRed Chalk Resources LLC3539.6K22Jan 1993 – Jul 2026
Pyron O-1-17019Chicon LakeRed Chalk Resources LLC3361.3K0Jun 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 2,009 · prior 12 2,698(-26%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1CG Oil Co.Jan 1993 → Feb 1996
  2. 2Calk, Roger D.Mar 1996 → Jun 2005
  3. 3Calk Oil CompanyJul 2005 → Sep 2007
  4. 4Omni E & P, Inc.Oct 2007 → Apr 2010
  5. 5Omni Oil & Gas, Inc.May 2010 → Sep 2015
  6. 6RPG Operating LLCOct 2015 → Jul 2020
  7. 7JM Calk Operating, LLCAug 2020 → May 2025
  8. 8Red Chalk Resources LLCJun 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
764953-99RecompletionOmni Oil & Gas, Inc.Jun 19, 2013Jun 26, 2013Jul 1, 20131,350
302705-99DrillCG Oil Co.May 27, 1986May 29, 1986—1,350

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-11623————
—— O-1-17019————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Escandido624
Olmos912
Anacacho1,284
Anachaco1,284

Perforations

Perforated and open-hole intervals.

FromToType
912932Perforated
1,2841,304Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.51,3506.75167 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 28, 2014Jul 31, 2013—
00Jan 13, 1987Dec 12, 1986Yes
00Jan 7, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/02937578, documented in the API reference.