WELL · 42-029-38075 · DISTRICT 1
Liebe-House A #20K
Bexar County · Fairfield field · Vertical
Liebe-House A #20K (API 42-029-38075) is a plugged well in Bexar County, plugged March 3, 2016, last operated by Simco Oil LLC.
The RRC has issued one drilling permit, issued May 4, 1989, permitted to 1,400 ft.
It was permitted by Hodge, C. Energy Inc. and has since transferred to Simco Oil LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Escondido, Anacacho.
Its 2 leases have reported 12.9K barrels of oil and 38 mcf of gas since January 1993, last reporting in July 2026. The leases carry 28 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Hodge, C. Energy Inc.; the EWA schedule now lists a different operator.
Lytle, TX · P-5 Y, filed Dec 4, 2025 · (210) 606-8512
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Simco Oil LLC |
| Production reports | Simco Oil, LLCthrough Apr 2026 |
| Latest permit | Hodge, C. Energy Inc.May 4, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,400
- total depth, ft
- 1
- permits on file
- May 4, 1989
- last permit issued
- May 15, 1989
- completed
- 12.9K
- cumulative oil, bbl
- 38
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 15, 1989
- Shut in
- —
- Plugged
- Mar 3, 2016
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 28 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Liebe-House A O-1-7002 | Fairfield | Simco Oil, LLC | 27 | 12.1K | 19 | Jan 1993 – Jul 2026 |
| Liebe-House O-1-12599 | Fairfield | Hardwick, Ross H. Oil Company | 1 | 838 | 19 | Jan 1993 – Mar 2016 |
Oil, barrels lease total
Last 12 months 13 · prior 12 4(+225%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hardwick, Ross H. Oil CompanyJan 1993 → Apr 2005
- 2Ghiselli Oil, Inc.Mar 1998 → Jun 1998
- 3Simco OilMay 2005 → Dec 2013
- 4Simco Oil, LLCJan 2014 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 358884-99 | Drill | Hodge, C. Energy Inc. | May 3, 1989 | May 4, 1989 | — | 1,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-7002 | — | — | — | — |
| — | — O-1-12599 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,225 | 1,285 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 4.5 | 1,350 | 6.75 | 172 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 7, 1990 | — | — |
| 00 | Jun 5, 1989 | May 25, 1989 | Yes |
| 00 | Jun 1, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-029-38075 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-029-38075 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02938075, documented in the API reference.