WELL · 42-029-38174 · DISTRICT 1
Baker T.H. #1H
Bexar County · Davie (Austin Chalk) field · Horizontal
Baker T.H. #1H (API 42-029-38174) is a plugged horizontal well in Bexar County, plugged December 23, 2010, last operated by Kidd Production CO..
The RRC has issued one drilling permit, issued April 17, 1992, permitted to 3,350 ft.
It was permitted by Texca Petroleum Inc. and has since transferred to Kidd Production CO. on the wellbore schedule.
Completion filings report one formation top, including Austin Chalk.
Its lease has reported 387 barrels of oil and 62 mcf of gas since January 1993, last reporting in October 2011. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Texca Petroleum Inc.; the EWA schedule now lists a different operator.
Luling, TX · P-5 Y, filed Jan 5, 2026 · 11 permits on file · (830) 263-2550
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Kidd Production Co. |
| Production reports | Success Oil Company, Inc.through Apr 1998 |
| Latest permit | Texca Petroleum Inc.Apr 17, 1992 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,350
- total depth, ft
- 1
- permits on file
- Apr 17, 1992
- last permit issued
- May 15, 1992
- completed
- 387
- cumulative oil, bbl
- 62
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 15, 1992
- Shut in
- —
- Plugged
- Dec 23, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baker, T.H. O-1-9118 | Davie (Austin Chalk) | Kidd Production Co. | 3 | 387 | 62 | Jan 1993 – Oct 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Success Oil Company, Inc.Jan 1993 → Apr 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 398521-99 | Drill | Texca Petroleum Inc. | Apr 17, 1992 | Apr 17, 1992 | Apr 29, 1992 | 3,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-9118 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 570 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 3,117 | -2,547 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,117 | 3,145 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 302 | 12.25 | 300 S |
| 7 | 3,255 | 9.875 | 720 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 31, 1992 | Jul 3, 1992 | Yes |
| 00 | Aug 21, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-029-38174 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-029-38174 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/02938174, documented in the API reference.