WELL · 42-033-31511 · DISTRICT 8
Rickner #1
Borden County · Vertical
Rickner #1 (API 42-033-31511) is a plugged well in Borden County, plugged January 14, 1998, last operated by Marshall & Winston, Inc..
The RRC has issued 3 drilling permits between 1991 and 1996, permitted to 8,700 ft.
Completion filings report 6 formation tops, including San Andres, Spraberry, Wolfcamp, Strawn.
Operator of record
Midland, TX · P-5 Y, filed Apr 4, 2026 · 359 permits on file · (432) 553-9747
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Marshall & Winston, Inc.Mar 22, 1996 |
- 8,700
- total depth, ft
- 3
- permits on file
- Mar 22, 1996
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 14, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rickner O-11-66870 | Myrtle, SW. (Ellenburger) | Patoil Corp. | 1 | 0 | 0 | Jan 1993 – Aug 2003 |
| Rickner O-11-67051 | Myrtle, SW. (Strawn D) | Patoil Corp. | 1 | 0 | 0 | Jan 1993 – Nov 1994 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 446172-99 | Reenter | Marshall & Winston, Inc. | Mar 22, 1996 | Mar 22, 1996 | Apr 17, 1996 | 3,300 |
| 409911-99 | Recompletion | Patoil Corp. | Mar 16, 1993 | Mar 19, 1993 | Jun 21, 1992 | 8,456 |
| 394049-99 | Drill | Patoil Corp. | Nov 15, 1991 | Nov 19, 1991 | Dec 4, 1991 | 8,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-66870 | — | — | — | — |
| — | — O-11-67051 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,505 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 2,710 | -205 |
| Spraberry | 5,100 | -2,595 |
| Wolfcamp | 7,180 | -4,675 |
| Strawn | 7,834 | -5,329 |
| Mississippian | 8,246 | -5,741 |
| EllenburgerELLENBERGER | 8,406 | -5,901 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,191 | 8,195 | Perforated |
| 8,450 | 8,455 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 210 | 17.5 | 225 S |
| 8.625 | 2,520 | 11.75 | 300 S |
| 5.5 | 8,469 | 7.875 | 355 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 4, 1993 | Apr 8, 1992 | Yes |
| 00 | May 17, 1993 | — | — |
| 00 | Jul 7, 1992 | Mar 24, 1992 | — |
| 00 | Jun 25, 1992 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-033-31511 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-033-31511 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000102347 | W-14 Disposal | Plugged Jan 29, 1998 | 1,500 | 1,500 | 3,106–3,144 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03331511, documented in the API reference.