WELL · 42-039-03975 · DISTRICT 3

Old Ocean Unit #107

N

Brazoria County  · Vertical

Old Ocean Unit #107 (API 42-039-03975) is a former disposal or injection well in Brazoria County, last operated by Hilcorp Energy Company; its UIC permit is no longer active.

The RRC has issued 5 drilling permits between 1984 and 2008, permitted to 10,552 ft.

Completion filings report 3 formation tops, including F-9, F-10, F-11.

Operator of record

Hilcorp Energy Company

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,454 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHilcorp Energy CompanyOct 10, 2008
10,552
total depth, ft
5
permits on file
Oct 10, 2008
last permit issued
—
completed
0
cumulative oil, bbl
1.59M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Old Ocean Unit G-3-212145Old Ocean (F-10)Hilcorp Energy Company10274KSep 2004 – Jul 2026
Old Ocean Unit G-3-7593Old Ocean (Armstrong)Hilcorp Energy Company101.31MJan 1993 – Sep 2004

Gas, mcf lease total

Last 12 months 13,860 · prior 12 12,894(+7%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJan 1993 → Feb 1998
  2. 2Hilcorp Energy CompanySep 1998 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
672272-99RecompletionHilcorp Energy CompanyOct 1, 2008Oct 10, 2008—10,552
550053-99RecompletionHilcorp Energy CompanyAug 24, 2004Aug 24, 2004—9,950
374672-99RecompletionAmoco Production CompanyJun 19, 1990Jun 21, 1990Sep 25, 199010,552
342090-99RecompletionAmoco Production CompanyFeb 1, 1988Feb 1, 1988—10,552
264044-99RecompletionAmoco Production Co.-AlvinDec 27, 1984Dec 31, 1984—10,527

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-7593————
—— G-3-212145————

Formation tops

As filed on W-2/G-1. Subsea from 47 ft elevation.Download CSV →

FormationMD ftSubsea
F-99,658-9,611
F-109,802-9,755
F-119,957-9,910

Perforations

Perforated and open-hole intervals.

FromToType
9,5769,588Perforated
9,8089,822Perforated
9,8379,857Perforated
9,8609,868Perforated
9,8909,896Perforated
9,9129,918Perforated
9,9589,978Perforated
10,05510,075Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,50718350 S
13.3751,507——
9.6256,99512.25500 S
9.6256,995——
2.37510,085——
710,5278.625500 S
710,527——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 20, 2006May 25, 2005Yes
00Nov 14, 2005——
00Feb 20, 1991Jan 11, 1991Yes
00Jun 21, 1988May 16, 1988—
00May 8, 1985Apr 24, 1985—
00Jan 12, 1984Dec 4, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 1984
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000042099UIC PermitCanceled Jul 22, 1986000–0

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011984

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03903975, documented in the API reference.