WELL · 42-039-30818 · DISTRICT 3

Vieman, L.D. #4

N

Brazoria County  · Vertical

Vieman, L.D. #4 (API 42-039-30818) is a permitted well in Brazoria County filed by Magnum Producing, LP; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1977 and 2011, permitted to 10,500 ft.

Completion filings report 2 formation tops, including Anahuac, Frio.

Its 3 leases have reported 55.9K barrels of oil and 101K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Magnum Producing, LP

Corpus Christ, TX · P-5 Y, filed Dec 4, 2025 · 312 permits on file · (361) 446-2414

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMagnum Producing, LPthrough Aug 2024
Latest permitMagnum Producing, LPJun 9, 2011
10,500
total depth, ft
5
permits on file
Jun 9, 2011
last permit issued
—
completed
55.9K
cumulative oil, bbl
101K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vieman, L.D. O-3-21610Blue Lake (9400)Magnum Producing, LP155.9K75.2KJan 1993 – Jul 2026
Vieman, L. D. G-3-214575Blue Lake (9400)Magnum Engineering Company1025.5KMar 2003 – Nov 2010
Vieman, L.D. O-3-17324Blue Lake (10100)Gale Enterprises, Inc.100Jan 1993 – Dec 1993

Oil, barrels lease total

Last 12 months 0 · prior 12 6(-100%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gale Enterprises, Inc.Jan 1993 → Jan 2002
  2. 2Magnum Engineering CompanyMar 2002 → Dec 2010
  3. 3Magnum Producing, LPJan 2011 → Aug 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
717822-99RecompletionMagnum Producing, LPJun 6, 2011Jun 9, 2011—10,445
401163-99RecompletionGale Enterprises, Inc.Jul 13, 1992Aug 24, 1992Apr 2, 19929,500
203337-99RecompletionWhitson, James A., Jr.Nov 9, 1983Jul 28, 1983—10,407
18498-99RecompletionWhitson, James A., Jr.Feb 17, 1978Feb 17, 1978—10,447
3124-99RecompletionWhitson, James A., Jr.Jul 14, 1977Jul 14, 1977—10,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-214575————
—— O-3-17324————
—— O-3-21610————

Formation tops

As filed on W-2/G-1. Subsea from 48 ft elevation.Download CSV →

FormationMD ftSubsea
AnahuacANAHUAC SH6,450-6,402
AnahuacANAHUAC SH.6,450-6,402
Frio8,150-8,102

Perforations

Perforated and open-hole intervals.

FromToType
9,3989,404Perforated
10,11910,121Perforated
10,11910,131Perforated
10,12710,132Perforated
10,187—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,33714.75500 S
2.37510,024——
2.37510,259—700 S
5.510,4458.75200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 18, 2011Jan 4, 2011—
00Mar 14, 2006——
00Sep 18, 1992Jun 25, 1992Yes
00Aug 28, 1992Feb 7, 1984—
00Mar 26, 1984Feb 7, 1984—
00Mar 6, 1984Feb 7, 1984—
00Jan 12, 1984Sep 30, 1983—
00Jan 12, 1984Mar 17, 1978—
00Jan 12, 1984Jun 23, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03930818, documented in the API reference.