WELL · 42-039-31381 · DISTRICT 3

Sweet a E.A. #4

N

Brazoria County · Rattlesnake Mound (6400) field  · Vertical

Sweet A E.A. #4 (API 42-039-31381) is a well in Brazoria County operated by Mobil Producing TX. & N.M. Inc., completed May 9, 1979.

The RRC has issued 5 drilling permits between 1979 and 1992, permitted to 7,500 ft.

It was permitted by Bridge Oil Company, L. P. and has since transferred to Mobil Producing TX. & N.M. Inc. on the wellbore schedule.

No lease production has been reported under this well’s leases.

Operator of record

Mobil Producing TX. & N.M. Inc.

Permitted by Bridge Oil Company, L. P.; the EWA schedule now lists a different operator.

Spring, TX · P-5 Y, filed May 4, 2026 · 6,763 permits on file · (281) 773-7706

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMobil Producing TX. & N.M. Inc.
Production reportsBridge Oil Company, L. P.through Mar 1994
Latest permitBridge Oil Company, L. P.Aug 3, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
5
permits on file
Aug 3, 1992
last permit issued
May 9, 1979
completed
0
cumulative oil, bbl
98.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 9, 1979
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sweet, E. A. "A" G-3-142125Rattlesnake Mound (5260)Amrwr, LLC1098.5KJan 1993 – Jul 2026
— G-3-130940——000—
— G-3-141575——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Company, L. P.Jan 1993 → Mar 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
401948-99RecompletionBridge Oil Company, L. P.Aug 3, 1992Aug 3, 1992Jul 24, 19925,340
400359-99RecompletionBridge Oil Company, L. P.Jun 19, 1992Jun 24, 1992Jun 4, 19927,186
359934-99RecompletionPetrus Oil Company, L.P.Jun 1, 1989Jun 5, 1989—7,186
302548-99RecompletionMobil Producing TX. & N.M. Inc.May 21, 1986May 27, 1986—7,186
43124-99DrillGeneral Crude Oil Co.Feb 26, 1979Feb 26, 1979Apr 11, 19797,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-130940————
—— G-3-141575————
—— G-3-142125————

Perforations

Perforated and open-hole intervals.

FromToType
5,2595,261Perforated
5,3725,380Perforated
5,4925,498Perforated
5,8575,860Perforated
6,4196,423Perforated
6,4196,436Perforated
6,4336,436Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,21712.5510 S
9.6251,217——
2.3755,739——
5.57,1868.5900 S
5.57,186——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 16, 1992Aug 4, 1992Yes
00Sep 1, 1992——
00Jul 16, 1992Jun 17, 1992Yes
00Jul 8, 1992——
00Jun 28, 1989Jun 1, 1989Yes
00Jun 16, 1989——
00Jul 30, 1986Jun 27, 1986Yes
00Jul 19, 1986——
00Aug 24, 1984Jun 27, 1984—
00Jul 10, 1984Jun 27, 1984—
00Jan 12, 1984Jun 5, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03931381, documented in the API reference.