WELL · 42-039-31828 · DISTRICT 3
Coleman Cleo Beth Gas Unit #1
Brazoria County · Denike-Tom Phillips (9800 Frio) field · Directional · Sidetrack
Coleman Cleo Beth Gas Unit #1 (API 42-039-31828) is a plugged well in Brazoria County, plugged March 29, 2004, last operated by Edwards Gus CO..
The RRC has issued 3 drilling permits between 1982 and 1998, permitted to 12,700 ft.
Completion filings report 2 formation tops, including 9800frio, Vksbg.
Operator of record
Abilene, TX · P-5 Y, filed Jan 9, 2004 · 47 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Edwards Gus Co. |
| Production reports | Edwards, Gus Co.through Jan 2003 |
| Latest permit | Edwards, Gus Co.Mar 5, 1998 |
- 12,700
- total depth, ft
- 3
- permits on file
- Mar 5, 1998
- last permit issued
- Mar 6, 1997
- completed
- 0
- cumulative oil, bbl
- 22K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 6, 1997
- Shut in
- —
- Plugged
- Mar 29, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coleman, Cleo Beth Gas Unit G-3-167783 | Denike-Tom Phillips (9800 Frio) | Edwards, Gus Co. | 1 | 0 | 22K | Mar 1997 – Jun 2004 |
| Coleman, Melvin O-3-20828 | Wildcat | Edwards, Gus Co. | 1 | 0 | 0 | Jan 1993 – May 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Edwards, Gus Co.Jan 1999 → Jan 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 470573-99 | Recompletion | Edwards, Gus Co. | Nov 25, 1997 | Mar 5, 1998 | Jun 14, 1996 | 11,088 |
| 413948-99 | Recompletion · sidetrack | BNP Petroleum Corporation | Jul 16, 1993 | Aug 26, 1993 | Oct 11, 1993 | 11,705 |
| 157980-99 | Drill | Puma Exploration Company | Apr 26, 1982 | Apr 26, 1982 | Jul 7, 1982 | 12,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-167783 | — | — | — | — |
| — | — O-3-20828 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 42 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 9800FRIO | 10,347 | -10,305 |
| Vksbg | 10,570 | -10,528 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,413 | 10,440 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,510 | 12.25 | 400 S |
| 7 | 10,431 | — | — |
| 7 | 11,691 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 5, 1998 | Oct 15, 1997 | Yes |
| 00 | May 7, 1998 | — | — |
| 00 | Mar 14, 1995 | Dec 5, 1994 | — |
| 00 | Dec 12, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-039-31828 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-039-31828 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03931828, documented in the API reference.