WELL · 42-039-31875 · DISTRICT 3

Cannan C.G. #1

Plugged

Brazoria County · Danbury Dome West (Frio 10 500) field  · Vertical

Cannan C.G. #1 (API 42-039-31875) is a plugged well in Brazoria County, plugged June 25, 1988, last operated by Howard Douglas J &Martino Joe C.

The RRC has issued one drilling permit, issued December 20, 1982, permitted to 14,200 ft.

It was permitted by Towner Petroleum Company and has since transferred to Howard Douglas J &Martino Joe C on the wellbore schedule.

Operator of record

Howard Douglas J &martino Joe C

Permitted by Towner Petroleum Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Dec 7, 2001 · 23 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHoward Douglas J &martino Joe C
Production reportsnone
Latest permitTowner Petroleum CompanyDec 20, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,200
total depth, ft
1
permits on file
Dec 20, 1982
last permit issued
Mar 20, 1983
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 20, 1983
Shut in
—
Plugged
Jun 25, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
181972-99DrillTowner Petroleum CompanyDec 20, 1982Dec 20, 1982—14,200

Perforations

Perforated and open-hole intervals.

FromToType
10,48610,664Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,52217.252,375 S
2.37510,391——
7.62510,99512.251,280 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Apr 25, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03931875, documented in the API reference.