WELL · 42-039-31906 · DISTRICT 3
Miller Ralph #2A
Brazoria County · Collins Lake (Fault Block D) field · Vertical
Miller Ralph #2A (API 42-039-31906) is a well in Brazoria County operated by Standard Resources Corp., completed April 29, 1983.
The RRC has issued 2 drilling permits between 1983 and 1985, permitted to 10,000 ft.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
No lease production has been reported under this well’s leases.
Operator of record
Houston, TX · P-5 Y, filed Nov 4, 2025 · 3 permits on file · (713) 705-2121
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Standard Resources Corp. |
| Production reports | Standard Resources Corp.through Dec 1996 |
| Latest permit | Standard Resources Corp.Dec 3, 1985 |
- 10,000
- total depth, ft
- 2
- permits on file
- Dec 3, 1985
- last permit issued
- Apr 29, 1983
- completed
- 0
- cumulative oil, bbl
- 262K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 29, 1983
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ralph-Miller G-3-119120 | Collins Lake, S. (Frio 9650) | Standard Resources Corp. | 1 | 0 | 262K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Standard Resources Corp.Jan 1993 → Dec 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 291538-99 | Recompletion | Standard Resources Corp. | Nov 18, 1985 | Dec 3, 1985 | — | 9,990 |
| 196628-99 | Drill | Pinnacle Company | Dec 5, 1983 | May 27, 1983 | — | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-119120 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)BASE MIOCENE | 7,397 | -7,380 |
| Miocene (undifferentiated)BASE OF MIOCENE | 7,397 | -7,380 |
| FrioTOP FRIO | 8,958 | -8,941 |
| FrioTOP OF FRIO | 8,958 | -8,941 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,550 | 9,554 | Perforated |
| 9,565 | 9,571 | Perforated |
| 9,592 | 9,598 | Perforated |
| 9,708 | 9,714 | Perforated |
| 9,708 | 9,731 | Perforated |
| 9,719 | 9,723 | Perforated |
| 9,728 | 9,731 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,225 | 12.25 | 560 S |
| 7 | 7,370 | 8.75 | 340 S |
| 2.375 | 9,606 | — | — |
| 4.5 | 9,920 | 6.125 | 350 S |
| 4.5 | 9,920 | 8.75 | 690 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 19, 1985 | Nov 18, 1985 | — |
| 00 | Dec 12, 1985 | — | — |
| 00 | Mar 27, 1984 | Nov 29, 1983 | — |
| 00 | Jan 12, 1984 | Nov 29, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-039-31906 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-039-31906 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03931906, documented in the API reference.