WELL · 42-039-32547 · DISTRICT 3

Schenck #7

N

Brazoria County · Chocolate Bayou (12 000-S) field  · Directional

Schenck #7 (API 42-039-32547) is a well in Brazoria County operated by Xog Resources LLC, completed May 1, 1998.

The RRC has issued 2 drilling permits (amended twice) between 1995 and 2013, permitted to 15,000 ft.

Completion filings report 8 formation tops, including Frio, Rycade, Rvcade, 12000 S. Sd..

No lease production has been reported under this well’s leases.

Operator of record

XOG Resources LLC

Spring, TX · P-5 Y, filed Jun 7, 2024 · 23 permits on file · (903) 288-9060

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXOG Resources LLC
Production reportsElliott Oil & Gas Operating Co.through Mar 2024
Latest permitXOG Resources, LLCFeb 12, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
4
permits on file
Feb 12, 2013
last permit issued
May 1, 1998
completed
0
cumulative oil, bbl
4.83M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 1, 1998
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schenck G-3-269946Chocolate Bayou ( Wieting Up.)Elliott Oil & Gas Operating Co.101.02MJan 2013 – Jul 2026
Schenck G-3-158354Chocolate Bayou (12,000-S)XOG Resources, LLC103.81MJan 1996 – Jan 2013

Gas, mcf lease total

Last 12 months 0 · prior 12 0

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJan 1996 → Oct 1998
  2. 2XOG Resources, LLCJan 2013 → Mar 2023
  3. 3Elliott Oil & Gas Operating Co.Sep 2023 → Mar 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
755489-99RecompletionXOG Resources, LLCJan 24, 2013Feb 12, 2013—11,815
433110-97DrillPhillips Petroleum CompanyOct 9, 1995Mar 6, 1995Apr 30, 199515,000
433110-98DrillPhillips Petroleum CompanyApr 25, 1995Mar 6, 1995—15,000
433110-99DrillPhillips Petroleum CompanyFeb 21, 1995Mar 6, 1995—15,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-158354————
—— G-3-269946————

Formation tops

As filed on W-2/G-1. Subsea from 52 ft elevation.Download CSV →

FormationMD ftSubsea
Frio8,805-8,753
Frio8,810-8,758
Rycade10,590-10,538
Rycade10,621-10,569
Rvcade10,625-10,573
12000 S. Sd.12,085-12,033
Andrau12,300-12,248
12000 Sand12,400-12,348
Andrau12,457-12,405
IP Sand14,099-14,047
IP Sd.14,099-14,047

Perforations

Perforated and open-hole intervals.

FromToType
11,31411,320Perforated
12,10412,114Perforated
12,15512,174Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3754,41017.53,426 S
9.62511,71512.251,750 S
712,6458.5430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 30, 2013Feb 15, 2013—
00Jun 5, 1998May 20, 1998—
00Jun 14, 1996Apr 16, 1996Yes
00Jun 7, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03932547, documented in the API reference.