WELL · 42-039-32654 · DISTRICT 3

Ramsey State Prison Farm A #10

Y

Brazoria County · Lochridge field · Injection  · Vertical

Ramsey State Prison Farm A #10 (API 42-039-32654) is a well in Brazoria County operated by Mcgowan Working Partners Inc., completed January 15, 2020 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued August 3, 1998, permitted to 7,000 ft.

It was permitted by Mcgowan Working Partners and has since transferred to Mcgowan Working Partners Inc. on the wellbore schedule.

Completion filings report one formation top, including Lochridge.

Its lease has reported 410K barrels of oil and 286K mcf of gas since July 1998, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 809K barrels injected in the 12 months reported through August 2025.

Operator of record

McGowan Working Partners Inc.

Permitted by McGowan Working Partners; the EWA schedule now lists a different operator.

Jackson, MS · P-5 Y, filed Aug 4, 2025 · 60 permits on file · (800) 224-4572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcGowan Working Partners Inc.
Production reportsMcGowan Working Partners, Inc.through Apr 2026
Latest permitMcGowan Working PartnersAug 3, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
1
permits on file
Aug 3, 1998
last permit issued
Jan 15, 2020
completed
410K
cumulative oil, bbl
286K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 15, 2020
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ramsey State Prison Farm "A" O-3-23518LochridgeMcGowan Working Partners, Inc.3410K286KJul 1998 – Jul 2026

Oil, barrels lease total

Last 12 months 2,686 · prior 12 2,716(-1%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 4,296 · prior 12 4,164(+3%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1McGowan Working PartnersJul 1998 → Apr 2000
  2. 2McGowan Working Partners, Inc.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
478338-99DrillMcGowan Working PartnersJul 29, 1998Aug 3, 1998Aug 4, 19987,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-23518————

Formation tops

As filed on W-2/G-1. Subsea from 41 ft elevation.Download CSV →

FormationMD ftSubsea
Lochridge6,200-6,159

Perforations

Perforated and open-hole intervals.

FromToType
6,3186,332Perforated
6,4006,410Perforated
6,4186,428Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,23513.25533 S
7.6256,4709.875219 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 7, 2022Dec 15, 2021—
00Jun 4, 2001Oct 5, 2000—
00Feb 18, 2000Aug 20, 1998Yes
00Nov 13, 1998Sep 14, 1998—
00Oct 23, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

809K
bbl, last 12 reported months
34.4M
bbl, all reported
Aug 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088199H-1 InjectionActive5,0001006,200–6,450

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 808,907 · prior 12 817,965(-1%)

050K100K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03932654, documented in the API reference.