WELL · 42-039-32804 · DISTRICT 3
Blakely et AL #1
Brazoria County · Danbury Dome field · Shut IN · Vertical
Blakely ET AL #1 (API 42-039-32804) is a well in Brazoria County operated by HG Operating LLC, completed July 29, 2003 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued April 9, 2003, permitted to 5,000 ft.
It was permitted by Silver Oak Operating, Inc. and has since transferred to HG Operating LLC on the wellbore schedule.
Its lease has reported 14K barrels of oil and 38.5K mcf of gas since May 2003, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Silver Oak Operating, Inc.; the EWA schedule now lists a different operator.
Plano, TX · P-5 Y, filed Apr 4, 2026 · 5 permits on file · (214) 207-4715
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | HG Operating LLC |
| Production reports | HG Operating LLCthrough Mar 2026 |
| Latest permit | Silver Oak Operating, Inc.Apr 9, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 1
- permits on file
- Apr 9, 2003
- last permit issued
- Jul 29, 2003
- completed
- 14K
- cumulative oil, bbl
- 38.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 29, 2003
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Blakely, et AL O-3-24433 | Danbury Dome | HG Operating LLC | 2 | 14K | 38.5K | May 2003 – Jul 2026 |
Gas, mcf lease total
Last 12 months 332 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Silver Oak Operating, Inc.Mar 2004 → Dec 2004
- 2BXP Operating, LLCJul 2014 → Mar 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 530513-99 | Drill | Silver Oak Operating, Inc. | Apr 9, 2003 | Apr 9, 2003 | May 7, 2003 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-24433 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,193 | 2,194 | Perforated |
| 2,263 | 2,264 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,020 | 12.25 | 478 S |
| 5.5 | 4,787 | 7.875 | 798 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 21, 2003 | Oct 22, 2003 | — |
| 00 | Nov 12, 2003 | Oct 20, 2003 | Yes |
| 00 | Oct 30, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-039-32804 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-039-32804 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/03932804, documented in the API reference.