WELL · 42-039-32964 · DISTRICT 3

Black Stone Ivory #6

Plugged

Brazoria County · Chocolate Bayou ( Wieting Lo.) field  · Vertical

Black Stone Ivory #6 (API 42-039-32964) is a plugged well in Brazoria County, plugged January 8, 2026, last operated by Elliott Oil & Gas Operating CO..

The RRC has issued 2 drilling permits between 2007 and 2008, permitted to 13,000 ft.

Completion filings report 3 formation tops, including Frio, Weiting, Anamolina.

Operator of record

Elliott Oil & Gas Operating Co.

Magnolia, TX · P-5 Y, filed Sep 4, 2025 · 75 permits on file · (281) 367-9699

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleElliott Oil & Gas Operating Co.
Production reportsElliott Oil & Gas Operating Co.through Jul 2021
Latest permitElliott Oil & Gas Operating Co.Oct 27, 2008
13,000
total depth, ft
2
permits on file
Oct 27, 2008
last permit issued
May 21, 2008
completed
0
cumulative oil, bbl
987K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 21, 2008
Shut in
—
Plugged
Jan 8, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone Ivory G-3-249165Chocolate Bayou ( Wieting Lo.)Elliott Oil & Gas Operating Co.10895KMay 2008 – Jul 2026
Black Stone Ivory G-3-242372Chocolate Bayou (Anamolina)Elliott Oil & Gas Operating Co.1092.1KJun 2007 – Jul 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Elliott Oil & Gas Operating Co.Jun 2007 → Jul 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
673799-99RecompletionElliott Oil & Gas Operating Co.Oct 23, 2008Oct 27, 2008May 16, 200812,600
636630-99DrillElliott Oil & Gas Operating Co.Apr 5, 2007Apr 13, 2007Apr 18, 200713,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-242372————
—— G-3-249165————

Formation tops

As filed on W-2/G-1. Subsea from 25 ft elevation.Download CSV →

FormationMD ftSubsea
Frio8,800-8,775
Weiting10,690-10,665
Anamolina12,431-12,406

Perforations

Perforated and open-hole intervals.

FromToType
10,69210,692Perforated
12,43112,441Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,00014.751,795 S
7.62511,4579.8751,955 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 21, 2009May 18, 2009Yes
00Jul 11, 2009——
00Dec 8, 2008Aug 18, 2008Yes
00Nov 24, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/03932964, documented in the API reference.