WELL · 42-041-31156 · DISTRICT 3
Favor #1
Brazos County · Aggieland (Woodbine) field · Vertical
Favor #1 (API 42-041-31156) is a plugged well in Brazos County, plugged August 27, 2018, last operated by Ramtex Energy LLC.
The RRC has issued one drilling permit, issued June 12, 1984, permitted to 10,000 ft.
It was permitted by Inexco Oil Company and has since transferred to Ramtex Energy LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Woodbine.
Its lease has reported 25.6K barrels of oil and 413K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Inexco Oil Company; the EWA schedule now lists a different operator.
Tulsa, OK · P-5 Y, filed Mar 4, 2026 · 20 permits on file · (479) 287-7920
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ramtex Energy LLC |
| Production reports | Ramtex Energy LLCthrough Nov 2015 |
| Latest permit | Inexco Oil CompanyJun 12, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 1
- permits on file
- Jun 12, 1984
- last permit issued
- Aug 1, 1984
- completed
- 25.6K
- cumulative oil, bbl
- 413K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 1, 1984
- Shut in
- —
- Plugged
- Aug 27, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Favor O-3-17874 | Aggieland (Woodbine) | Ramtex Energy LLC | 1 | 25.6K | 413K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Energy Development Corp.Jan 1993 → Dec 2001
- 2Samedan Oil CorporationJan 2002 → Dec 2002
- 3Noble Energy IncJan 2003 → Feb 2004
- 4Chaparral Energy, L.L.C.Mar 2004 → Jul 2014
- 5Ramtex Energy LLCAug 2014 → Jan 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 241854-99 | Drill | Inexco Oil Company | Jun 14, 1984 | Jun 12, 1984 | — | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-17874 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 269 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 8,270 | -8,001 |
| Austin Chalk | 9,118 | -8,849 |
| Woodbine | 9,474 | -9,205 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,474 | 9,480 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,422 | 12.25 | 1,145 sx |
| 5.5 | 9,581 | 8.75 | 550 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 13, 1984 | Aug 24, 1984 | — |
| 00 | Sep 6, 1984 | Aug 24, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-041-31156 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-041-31156 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04131156, documented in the API reference.