WELL · 42-041-31204 · DISTRICT 3

Varisco Estate #2

N

Brazos County  · Vertical

Varisco Estate #2 (API 42-041-31204) is a permitted well in Brazos County filed by Howell Petroleum Corporation; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1984 and 1999, permitted to 9,000 ft.

Completion filings report 8 formation tops, including Caldwell (Austin Chalk), Austin Chalk, Eagle Ford, Kurten (Buda).

Its 4 leases have reported 30.1K barrels of oil and 23.3K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Howell Petroleum Corporation

Houston, TX · P-5 Y, filed Jul 2, 2004 · 99 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHowell Petroleum Corporationthrough Apr 2002
Latest permitHowell Petroleum CorporationAug 9, 1999
9,000
total depth, ft
4
permits on file
Aug 9, 1999
last permit issued
—
completed
30.1K
cumulative oil, bbl
23.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Varisco Estate O-3-25013Giddings (Buda)Wildfire Energy Operating LLC100Aug 2007 – Jul 2026
Varisco Estate O-3-23706Caldwell, NE (Georgetown)Anadarko E&P Company LP111.8K6.83KJul 1999 – Aug 2007
Varisco Estate O-3-21547Caldwell (Austin Chalk)Anadarko E&P Company LP218.3K16.4KJan 1993 – Apr 2003
— O-3-17971——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Howell Petroleum CorporationJan 1993 → Apr 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
486526-99RecompletionHowell Petroleum CorporationAug 9, 1999Aug 9, 1999Jul 6, 19997,761
400065-99OtherHowell Petroleum CorporationJun 10, 1992Jul 9, 1992Mar 12, 19917,761
358573-99RecompletionHowell Petroleum CorporationApr 25, 1989Apr 26, 1989—7,761
249113-99DrillHea Exploration, Inc.Aug 21, 1984Aug 21, 1984Sep 10, 19849,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-17971————
—— O-3-21547————
—— O-3-23706————
—— O-3-25013————

Formation tops

As filed on W-2/G-1. Subsea from 261 ft elevation.Download CSV →

FormationMD ftSubsea
Caldwell (Austin Chalk)6,980-6,719
Austin Chalk6,987-6,726
Eagle FordEAGLEFORD7,118-6,857
Kurten (Buda)7,410-7,149
Buda7,460-7,199
Caldwell NE (Georgetown)7,550-7,289
Del Rio7,557-7,296
Georgetown7,582-7,321

Perforations

Perforated and open-hole intervals.

FromToType
6,9807,116Perforated
7,4607,550Perforated
7,5507,674Perforated
7,6007,674Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,10012.25940 S
4.57,7617.875435 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 17, 2007May 4, 2007—
00May 24, 2007May 4, 2007—
00Aug 30, 1999Aug 13, 1999Yes
00Aug 20, 1999Jun 4, 1992—
00Jul 27, 1992Jun 4, 1992—
00Jul 22, 1992Oct 9, 1984—
00Oct 25, 1984Oct 9, 1984—
00Oct 18, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.