WELL · 42-041-31307 · DISTRICT 3

Penicka #1RE

N

Brazos County  · Horizontal · Sidetrack

Penicka #1RE (API 42-041-31307) is a permitted horizontal well in Brazos County filed by Arrow Exploration Company; no completion report is on file yet.

The RRC has issued 4 drilling permits between 1985 and 1996, permitted to 8,400 ft.

Completion filings report 5 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford, Georgetown.

Its lease has reported 140K barrels of oil and 248K mcf of gas since January 1993, last reporting in May 2021.

Operator of record

Arrow Exploration Company

Plano, TX · P-5 Y, filed Feb 6, 2009 · 36 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsMagnolia Oil & Gas Operating LLCthrough Dec 2020
Latest permitArrow Exploration CompanySep 10, 1996
8,400
total depth, ft
4
permits on file
Sep 10, 1996
last permit issued
—
completed
140K
cumulative oil, bbl
248K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Penicka O-3-19495Stone City (Austin Chalk)Magnolia Oil & Gas Operating LLC1140K248KJan 1993 – May 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Omni Petroleum CorporationApr 1993 → Feb 1994
  2. 2Delaware Ecco Petroleum Inc.Mar 1994 → Jul 1996
  3. 3Arrow Exploration CompanyAug 1996 → Dec 2004
  4. 4Emerald Operating Company, Inc.Jan 2005 → Aug 2008
  5. 5Enervest Operating, L.L.C.Sep 2008 → Jul 2018
  6. 6Magnolia Oil & Gas Operating LLCAug 2018 → Dec 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
452459-99Recompletion · sidetrackArrow Exploration CompanySep 10, 1996Sep 10, 1996Sep 7, 19968,000
407757-99RecompletionOmni Petroleum CorporationDec 30, 1992Jan 21, 1993—7,750
325291-99RecompletionProducers Engineering CompanyJan 12, 1987Jan 14, 1987—8,276
272613-99DrillBse Production Co.Apr 15, 1985Apr 18, 1985—8,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-19495————

Formation tops

As filed on W-2/G-1. Subsea from 257 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap7,110-6,853
Austin Chalk7,310-7,053
Austin Chalk7,320-7,063
Eagle FordEAGLEFORD7,528-7,271
Eagle FordEAGLEFORD SHALE7,580-7,323
Georgetown7,970-7,713
Duck Creek8,202-7,945

Perforations

Perforated and open-hole intervals.

FromToType
2,2799,653Perforated
7,3357,332Perforated
7,3959,710Perforated
7,4459,339Perforated
7,4478,461Perforated
7,4517,505Perforated
7,4527,528Perforated
7,9948,130Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,33812.251,010 S
5.58,2767.875405 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 22, 1996Oct 10, 1996Yes
00Feb 13, 1987Jan 28, 1987Yes
00Feb 10, 1987——
00Oct 29, 1985Aug 20, 1985—
00Oct 8, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04131307, documented in the API reference.