WELL · 42-041-31719 · DISTRICT 3
Moore Tom #3H
Brazos County · Clay NE (Austin Chalk 11350) field · Horizontal
Moore Tom #3H (API 42-041-31719) is a plugged horizontal well in Brazos County, plugged November 6, 2010, last operated by Douglas Petroleum Inc..
The RRC has issued one drilling permit, issued January 19, 1993, permitted to 12,200 ft.
It was permitted by Westlands Resources Corporation and has since transferred to Douglas Petroleum Inc. on the wellbore schedule.
Completion filings report one formation top, including Austin Chalk.
Operator of record
Permitted by Westlands Resources Corporation; the EWA schedule now lists a different operator.
Spring, TX · P-5 Y, filed Jun 5, 2010
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Douglas Petroleum Inc. |
| Production reports | Douglas Petroleum Inc.through Mar 2001 |
| Latest permit | Westlands Resources CorporationJan 19, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,200
- total depth, ft
- 1
- permits on file
- Jan 19, 1993
- last permit issued
- Apr 20, 1993
- completed
- 0
- cumulative oil, bbl
- 189K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Nov 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 20, 1993
- Shut in
- —
- Plugged
- Nov 6, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Moore, Tom G-3-145269 | Clay, NE (Austin Chalk 11350) | Douglas Petroleum Inc. | 1 | 0 | 189K | Apr 1993 – Nov 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rwa CorporationApr 1993 → Sep 1999
- 2Westlands Resources CorporationOct 1999 → Dec 2000
- 3Douglas Petroleum Inc.Mar 2001 → Mar 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 408183-99 | Drill | Westlands Resources Corporation | Jan 19, 1993 | Jan 19, 1993 | Feb 1, 1993 | 12,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-145269 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 200 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkAUSTIN | 11,671 | -11,471 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,858 | 12,699 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,510 | 14.75 | 1,900 S |
| 7.625 | 11,858 | 9.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 15, 1993 | May 11, 1993 | Yes |
| 00 | Jun 1, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-041-31719 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-041-31719 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04131719, documented in the API reference.