WELL · 42-041-31732 · DISTRICT 3
McFarlane-Moore Unit #1H
Brazos County · Clay NE (Austin Chalk 11350) field · Horizontal
Mcfarlane-Moore Unit #1H (API 42-041-31732) is a plugged horizontal well in Brazos County, plugged April 17, 2023, last operated by Southwest Resources Inc..
The RRC has issued one drilling permit, issued March 11, 1993, permitted to 12,500 ft.
It was permitted by Seneca Resources Corp. and has since transferred to Southwest Resources Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Navarro, Pecan Gap, Austin Chalk.
Operator of record
Permitted by Seneca Resources Corp.; the EWA schedule now lists a different operator.
Brenham, TX · P-5 Y, filed Mar 4, 2026 · 3 permits on file · (979) 203-6530
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Southwest Resources Inc. |
| Production reports | Crawford Hughes Operating Co.through Sep 2013 |
| Latest permit | Seneca Resources Corp.Mar 11, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 1
- permits on file
- Mar 11, 1993
- last permit issued
- May 12, 1993
- completed
- 0
- cumulative oil, bbl
- 1.51M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1993 THROUGH Aug 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 12, 1993
- Shut in
- —
- Plugged
- Apr 17, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McFarlane-Moore Unit G-3-146056 | Clay, NE (Austin Chalk 11350) | Southwest Resources, Inc. | 1 | 0 | 1.51M | May 1993 – Aug 2023 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seneca Resources CorporationMay 1993 → Mar 2000
- 2Crawford Energy Operating CoApr 2000 → Aug 2008
- 3Crawford Hughes Operating Co.Sep 2008 → Sep 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 409787-99 | Drill | Seneca Resources Corp. | Mar 11, 1993 | Mar 11, 1993 | Mar 17, 1993 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-146056 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 232 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Navarro | 8,778 | -8,546 |
| Pecan Gap | 10,914 | -10,682 |
| Austin Chalk | 11,526 | -11,294 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,614 | 14,971 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 115 | 24 | 80 S |
| 10.75 | 3,290 | 14.75 | 1,775 S |
| 7.625 | 11,614 | 9.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 24, 1993 | Jun 4, 1993 | Yes |
| 00 | Aug 12, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-041-31732 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-041-31732 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/04131732, documented in the API reference.