WELL · 42-041-32058 · DISTRICT 3

Robinson Jackie #2H

N

Brazos County · Madisonville W. (Woodbine -A-) field  · Horizontal

Robinson Jackie #2H (API 42-041-32058) is a horizontal well in Brazos County operated by Wildfire Energy Operating LLC, completed March 28, 2011.

The RRC has issued one drilling permit, issued January 21, 2011, permitted to 8,000 ft.

It was permitted by Crimson Energy Ptnrs Iii, L.L.C. and has since transferred to Wildfire Energy Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Wilcox, Austin Chalk, Woodbine.

Its 2 leases have reported 329K barrels of oil and 76.3K mcf of gas since July 2010, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Wildfire Energy Operating LLC

Permitted by Crimson Energy Ptnrs III, L.L.C.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Oct 4, 2025 · 171 permits on file · (713) 261-3871

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWildfire Energy Operating LLC
Production reportsWildfire Energy Operating LLCthrough Mar 2026
Latest permitCrimson Energy Ptnrs III, L.L.C.Jan 21, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
1
permits on file
Jan 21, 2011
last permit issued
Mar 28, 2011
completed
329K
cumulative oil, bbl
76.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 28, 2011
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Robinson, Jackie O-3-25576Madisonville, W. (Woodbine -A-)Wildfire Energy Operating LLC3172K41.3KJul 2010 – Jul 2026
Robinson, Jackie S O-3-26003Madisonville, W. (Woodbine -A-)Wildfire Energy Operating LLC1156K35KApr 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 7,367 · prior 12 8,746(-16%)

05001K202420252026

Gas, mcf lease total

Last 12 months 1,237 · prior 12 1,901(-35%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Crimson Energy Ptnrs III, L.L.C.Jul 2010 → Oct 2014
  2. 2Hawkwood Energy Operating, LLCMay 2014 → Mar 2022
  3. 3Wildfire Energy Operating LLCApr 2022 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
708708-99DrillCrimson Energy Ptnrs III, L.L.C.Jan 18, 2011Jan 21, 2011Jan 21, 20118,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-25576————
—— O-3-26003————

Formation tops

As filed on W-2/G-1. Subsea from 299 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox3,079-2,780
Austin Chalk6,934-6,635
Woodbine7,383-7,084

Perforations

Perforated and open-hole intervals.

FromToType
7,61312,157Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,80012.251,366 S
4.512,3187.8752,231 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 4, 2013Apr 28, 2011Yes
00Oct 3, 2012Apr 28, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/04132058, documented in the API reference.